MODEL : TYPICAL ACTIVITIES
SCHEDULE |
|||||||||||||||
Item budget |
|
|
First year – months 0- 12 |
|
|||||||||||
|
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
|
|
|
|
Quarter 1 |
Quarter 2 |
Quarter 3 |
Quarter 4 |
|
||||||||
|
|
|
1 |
2 |
3 |
1 |
2 |
3 |
1 |
2 |
3 |
1 |
2 |
3 |
|
|
3. Material, vehicles and supplies. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.01 Purchase of hire of vehicles.. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30101 |
3.01.01 Vehicle (1) 4 wheel drive |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30102 |
3.01.02 Vehicle (2) 4 wheel drive |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30103 |
3.01.03 Bus (1) for workshops. Will be ceded (interest-free loan) to a local public transport cooperative in the second year under the micro-credits systems set up. |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30104 |
3.01.04 Autobus (2) pour workshops.Il sera cédé (emprunt sans intérets) à une coopérative de transport public local dans la deuxième année dans le cadre du système micro-crédits établi. |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator, secretariat |
30105 |
3.01.05 Pick-up pour entretien et structures fourniture en eau. Il sera cédé (emprunt sans intérets) par la suite à la cooperative entretien installations eau potable. |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 3.01 achat ou location de véhicules |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.02 Moblier, matériel d’ordinateur |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30201 |
3.02.01 Mobilier bureaux |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30202 |
3.02.02 Ordinateurs bureaux (4 @ Euro 2000) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30203 |
3.02.03 Printers (2) pour ordinateurs |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30204 |
3.02.04 Photocopieur (avec back-up) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30205 |
3.02.05 Éclairage /conditionnement photovoltaique salle ordinateurs (5 sets – 1 backup) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 3.02 moblier, matériel d’ordinateur |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.03 Pièces détachées/ matériel pour machines, outils |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
30301 |
3.03.01 Pièces détachées pour véhicules 5 véhicules x Euro 1000 par an |
2,3,4 |
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
30302 |
3.03.02 Pièces détachées pour équipement de bureau 8 items x Euro 200 par an x 2 ans |
2,3,4 |
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 3.03 pièces détachées/ matériel pour
machines, outils |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.04 Autre (préciser) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.04.01 Mobilier et équipement pour ateliers Moraisiens |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
|
3040101 |
3.04.01.01 Mobilier ateliers (local) |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat, beneficiaries |
3040102 |
3.04.01.02 Équipement didactique pour workshops (tableau noir; écran projection etc) |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
3040303 |
3.04.01.03 Ordinateur projections Powerpoint |
|
|
|
X |
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
3040304 |
3.04.01.04 Projecteur |
|
|
|
X |
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 3.04 autre |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3. Sous-total matériel,
véhicules et fournitures. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. Bureau local/coûts de l’action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.01 Coût du/des véhicules |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40101 |
4.01.01 Voiture (1) traction 4 roues.100km/jour x 700 jours.70000 km @ Euro 0,25 |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat, drivers |
40102 |
4.01.02 Voiture (2) traction 4 roues.100km/jour x 700 jours.70000 km @ Euro.0.25 |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat, drivers |
40103 |
4.01.03 Autobus (1).100km/jour x 350 jours.35000 km @ 0.40 |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat, drivers |
40104 |
4.01.04 Autobus (2).100km/jour x 350 jours. 35000 km @ 0.40. |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat, drivers |
40105 |
4.01.05 Pickup.100km/jour x 700 jours.70000 km @ Euro 0.25 |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat, drivers |
40106 |
4.01.06 Voiture superviseur AGPA.50km/jour x 700 jours @ Euro 0.25. |
2.3,4,5 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Applicant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 4.01 Coût du/des véhicules |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.02 Location des bureaux .(achat bureaux) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40201 |
4.02.01 Achat base permanente du projet |
|
X |
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
|
4.02.02 Structures pour ateliers Moraisiens. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4020201 |
4.02.02.01 Structuur (500m2) pour ateliers |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant, beneficiaries |
4020202 |
4.02.02.02 Construction zone sanitaire pour ateliers |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant, beneficiaries |
4020203 |
4.02.02.03 Structures assainissement éco-san pour ateliers (10 toilettes) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant, beneficiaries |
4020204 |
4.02.02.04 Construction zone cuisines pour ateliers |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant, beneficiaries |
4020205 |
4.02.02.05 Construction crèche enfants pour utilisation pendant les ateliers. |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant, beneficiaries |
4020206 |
4.02.02.06 Forage pour fourniture en eau pour atelier forage 100m x Euro 150.(6m3 par jour) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Well
drilling company. |
4020207 |
4.02.02.07 Pompe immergée solaire pour ateliers |
|
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
4020208 |
4.02.02.08 Panneaux solaires + support pour pompe atelier (400Wc) |
|
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
4020209 |
4.02.02.09 Système réservoir (5-10m3) pour atelier |
|
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
4020210 |
4.02.02.10 Système à énergie photovoltaique pour ateliers (400Wc) |
|
|
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 4.02 Structures pour ateliers Moraisiens. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.03 Consommables-Fournitures de bureau |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40301 |
4.03.01 Papier, toner, CD’s (vides) et fourniture générale pour bureaux. Fourniture initiale |
2,3,4 |
X |
|
|
|
X |
|
|
X |
|
|
X |
|
Coordinator,
secretariat |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 4.03 Consommables-Fournitures de bureau |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.04 Autres services (tél./ électricité/ chauffage/
maintenance) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
40401 |
4.04.01 Téléphones mobiles.24 mois @ Euro 200. Frais locaux. |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
secretariat |
40402 |
4.04.02 Électricité – compte tenue utilisation aussi des structures photovoltaïques prévues.24 mois @ Euro 100.Frais locaux. |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Secretariat |
40403 |
4.04.03 Maintenance.24 mois @ 17 heures (environ) |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
Beneficiaries |
40404 |
4.04.04 Permis et formalités.Frais locaux. |
|
X |
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 4.04 Autres services |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4. Sous-total bureau local/coûts de l’action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Autres coûts, services |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.01 Publications |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50101 |
5.01.01 Préparation, rédaction et publications dessins et spécifications finaux sur place. Frais locaux. |
|
X |
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
|
5.02 Études, recherches |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50201 |
5.02.01 Études environnement : lois 88-14. Rapports.Frais locaux. |
|
X |
|
|
|
|
|
|
|
|
|
|
|
Coordinator |
|
5.03 Coûts d’audit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50301 |
5.03.01 Coûts d’audit.3 ans x Euro 2.000. Frais locaux. |
3,4,5 |
|
|
|
|
|
|
|
|
|
|
|
X |
Applicant,
auditing commission |
|
5.04 Coûts d’évaluation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50401 |
5.04.01 Évaluation fin projet |
|
|
|
|
|
|
|
|
|
|
|
|
|
Applicant,
auditing commission |
50402 |
5.04.02 Rapports évaluation périodique. 8 rapports x Euro 250 |
2,3,4 |
|
|
X |
|
|
X |
|
|
X |
|
|
X |
Applicant,
auditing commission |
|
5.05 Traduction, interprètes |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.06 Services financiers |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50601 |
5.06.01 Garanti bancaire : AGPA Euro 1.500.000 @ 2.5 pro-mille |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Applicant |
50602 |
5.06.02 Frais bancaires |
|
|
|
X |
|
|
X |
|
|
X |
|
|
X |
Coordinator,
Applicant |
|
5.07 Coûts des conférences/séminaires |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.08 Actions de visibilité |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.09 Assurances |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
50901 |
5.09.01 Résponsibilité civile tiers.(véhicules – bureaux - ateliers) Euro1.000.000 2.5 pro-mille par an. |
2/3/4/5 |
X |
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
50902 |
5.09.02 Tous risques travaux - assurance pas retenue nécessaire |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5. Sous total autres coûts, services |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.Autre (spécifier) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.01 Formation clubs d’hygiène |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60101 |
6.01.01 Atelier – Clubs Santé:participation femmes. (Monnaies locales pas encore en place) |
|
|
|
X |
X |
|
|
|
|
|
|
|
|
Consultant,
workshops specialist+ hygiene specialist, beneficiaries |
60102 |
6.01.02 Formation 189 clubs santé : participation femmes.(Monnaies locales pas encore en place) |
|
|
|
X |
X |
X |
|
|
|
|
|
|
|
Consultant,
workshops specialist+ hygiene specialist, beneficiaries |
60103 |
6.01.03 Matériel pour 189 clubs santé. (Petits achats locaux) |
|
X |
X |
|
|
|
|
|
|
|
|
|
|
Coordinator,
Consultant, beneficiaries |
60104 |
6.01.04 Formation animatrices 189 clubs santé.Participation femmes.(Monnaies locales pas encore en place) |
|
|
|
X |
X |
|
|
|
|
|
|
|
|
Consultant,
workshops specialist+ hygiene specialist, beneficiaries |
60105 |
6.01.05 Gestion/vérification santé premiers 24 mois |
2,3,4 |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.01 : Formation clubs d’hygiène |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.02 Cours éducation à l'hygiène aux écoles |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
|
60201 |
6.02.01 Atelier- Cours éducation à l'hygiène aux écoles.Participants.(Monnaies locales pas encore en place) |
|
|
|
|
X |
X |
X |
|
|
|
|
|
|
Consultant,
workshops specialist+ hygiene specialist, beneficiaries |
60202 |
6.02.02 Matériel de cours hygiène aux écoles.Petits achats locaux |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator,
workshops specialist+ hygiene specialist, beneficiari |
60203 |
6.02.03 Gestion/ vérification cours éducation à l'hygiène aux écoles premiers 24 mois |
2,3,4 |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
Coordinator,
schools inspection |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.02 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.03 Structures sociales locales |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60301 |
6.03.01 Atelier- Structures sociales locales.Premières participations, jusqu’ à la création des structures financières locales. |
|
|
|
X |
X |
|
|
|
|
|
|
|
|
Consultant,
workshops specialist+ beneficiaries |
60302 |
6.03.02 Gestion structures sociales 189 commissions réservoir premiers 24 mois |
2,3,4 |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60303 |
6.03.03 Gestion structures sociales 32 commissions forage premiers 24 mois |
2,3,4 |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60304 |
6.03.04 Gestion structures sociales administration centrale premiers 24 mois |
2,3,4 |
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.03 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.04 Structure systèmes SEL-LETS |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60401 |
6.04.01 Atelier- Systèmes SEL-LETS.Premières participations, jusqu’ à la création des structures financières locales |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
Consultant,
workshop specialist+ beneficiaries |
60402 |
6.04.02 Bureaux et mobilier 32 systèmes SEL-LETS.Achats locaux. Voir 7.02.16 |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator+
beneficiaries |
60403 |
6.04.03 Ordinateur principal systèmes SEL-LETS et back-up. Voir 7.02.17 |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
|
60404 |
6.04.04 60 ordinateurs régistration transactions SEL-LETS (100 transactions/personne/heure).Voir 7.02.18 |
|
|
|
X |
X |
|
|
|
|
|
|
|
|
Coordinator,
consultant |
60405 |
6.04.05 Alimentation PV 64 systèmes SEL-LETS.Voir 7.02.19 |
|
|
|
X |
X |
|
|
|
|
|
|
|
|
Coordinator,
consultant |
60406 |
6.04.06.Gestion 189 structures SEL-LETS.niveau réservoir premiers 24 mois |
2,3,4 |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60407 |
6.04.07 Gestion 32 structures SEL-LETS.niveau forage premiers 24 mois |
2,3,4 |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60408 |
6.04.08 Gestion régistration transactions SEL-LETS niveau forage premiers 24 mois |
2,3,4 |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60409 |
6.04.09 Gestion centrale structures SEL-LETS premiers 24 heures |
2,3,4 |
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.04 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.05 Système Micro-crédit |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
|
60501 |
6.05.01 Atelier - Système Micro-crédit.Petits achats locaux |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
Consultant,
workshops specialist+ beneficiaries |
60502 |
6.05.02 Bureau et équipement système Micro-crédit.Frais locaux prévus. |
|
|
X |
X |
X |
|
|
|
|
|
|
|
|
Consultant,
workshops specialist+ beneficiaries |
60503 |
6.05.03 Gestion structures micro-crédit niveau 189 réservoirs premiers 24 mois |
2,3,4 |
|
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60504 |
6.05.04 Gestion structures micro-crédit niveau 32 forages premiers 24 mois |
2,3,4 |
|
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
60505 |
6.05.05 Gestion structures micro-crédit niveau central premiers 24 mois |
2,3,4 |
|
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.05 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.06 - Unités de
production articles en gypsecomposieten |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60601 |
6.06.01 Atelier - Unités de production articles en gypsecomposieten (2).Achats locaux. |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
Consultant,
gypsum specialist, workshops specialist + beneficiaries |
60602 |
6.06.02 Shovel/préparation dépôt gypse.Achat local |
|
|
|
|
|
X |
X |
|
|
|
|
|
|
Coordinator,
gypsum specialist |
60603 |
6.06.03 Construction et équipement usines (*15000 chaque usine - 2 usines.Achats locaux équipements préférés. |
|
|
|
|
|
|
X |
X |
X |
|
|
|
|
Consultant,
gypsum specialist+ beneficiaries |
60604 |
6.06.04 Formes et moules pour produit 2 usines.Voir 7.02.01 |
|
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Consultant,
gypsum specialist + beneficiaries |
60605 |
6.06.05 Localisation gisements et contrôles qualité. Frais locaux. |
|
|
|
X |
X |
X |
X |
|
|
|
|
|
|
Consultant,
gypsum specialist + beneficiaries |
60606 |
6.06.06 Camion ou petit tracteur pour shovel.Achat local préféré. |
|
|
|
|
X |
X |
|
|
|
|
|
|
|
Coordinator,
gypsum specialist |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.06: Unités de production articles en
gypsecomposieten |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.07 Structures recyclage assainissement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60701 |
6.07.01 Atelier– Systèmes recyclage. Petits achats locaux. |
|
|
|
|
|
|
X |
X |
|
|
|
|
|
Consultant,
workshops specialist + beneficiaries |
60702 |
6.07.02 Établissement réseau recyclage - assainissement. Voir 7.02.02 |
|
|
|
|
|
|
|
X |
X |
X |
|
|
|
Coordinator,
consultant, beneficiaries |
60703 |
6.07.03 Établissement réseau récolte compostage.Petits achats locaux. 189 résevoirs premiers 24 mois |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
Coordinator,
consultant, beneficiaries |
60704 |
6.07.04 Récolte journalière ordures organiques niveau |
2,3,4 |
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
Beneficiaries |
60705 |
6.07.05 Récolte ordures organiques niveau 32 forages premiers 24 mois |
2,3,4 |
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
Beneficiaries |
60706 |
6.07.06 Récolte ordures non-organiques niveau 32 forages premiers 24 mois |
2,3,4 |
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.07 Structures recyclage assainissement |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.08 Système bio-masse |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60801 |
6.08.01 Atelier- Système bio-masse. (Assainissement – santé).Petits achats locaux. |
|
|
|
|
|
|
|
X |
X |
|
|
|
|
Consultant,
wokshops specialist+ beneficiaries |
60802 |
6.08.02 Construction 32 unités de production de mini-briquettes pour foyers améliorés |
3 et 4 |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
Consultant,
gypsum specialiste+ beneficiaries |
60803 |
6.08.03 Équipements (y comprises presses) pour la production des mini-briquettes.Voir 7.02.21) |
3 et 4 |
|
|
|
|
|
|
|
X |
X |
X |
X |
|
Coordinator,
consultant, gypsum specialist |
60804 |
6.08.04 Production mini-briquettes niveau forages premiers 24 mois. (320.000 heures.) Exclu du projet. |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
X |
Beneficiaries |
60805 |
6.08.05 Production bio-masse pour mini-briquettes niveau résservoir premiers 24 mois. (120.000 heures). Exclu du projet |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
X |
Beneficiaries |
60806 |
6.08.06 Production premiers 2000 foyers améliorés (sur 20.000 environ programmés).(assainissement – santé) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.08 8 Système bio-masse |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.09 C264 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
60901 |
6.09.01 OW - Structures eau potable. Petits achats locaux. |
|
|
|
|
|
X |
X |
|
|
|
|
|
|
Coordinator,
secretariat |
60902 |
6.09.02 Établissement administration centrale des structures eau potable.Achats locaux. |
|
|
|
|
|
|
|
X |
X |
X |
|
|
|
Coordinator,
consultant, secretariat, beneficiaries |
60903 |
6.09.03 Coût prévu forages 3000m @ Euro 150.Voir sous-traitance 7.1 Travaux |
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
|
Well
drilling company |
60904 |
6.09.04 32 points lavage |
|
|
|
|
|
|
|
|
|
|
X |
X |
|
Beneficiaries |
60905 |
6.09.05 32 margelles pour pompes manuelles (groupes triples) |
|
|
|
|
|
|
|
|
|
|
X |
X |
|
Beneficiaries |
60906 |
6.09.06 Clôture et structures 32 zones forage, accommodation gardiens. Achats locaux. |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Beneficiaries |
60907 |
6.09.07 200 Pompes solaires.Voir 7.02.03 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Coordinator,
consultant |
60908 |
6.09.08 200 Supports panneaux.Faits localement. Petits achats locaux. |
|
|
|
|
|
|
|
|
|
|
|
|
|
Consultant,
gypsum specialist, beneficiaries |
60909 |
6.09.09 Panneaux solaires (189*300 W = 56.7 kW).Voir 7.02.04 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Coordinator,
consultant |
60910 |
6.09.10 96 pompes manuelles acier inoxydable.Voir 7.02.05 |
|
|
|
|
|
|
|
|
X |
X |
X |
|
|
Coordinator,
consultant |
60911 |
6.09.11 Câbles, tuyaux pour pompes/puits.Voir 7.02.06 |
|
|
|
|
|
|
|
|
X |
X |
X |
|
|
Coordinator,
consultant |
60912 |
6.09.12 Tuyaux puits aux réservoirs – 200000m @ Euro 0.5. Voir 7.02.07 |
|
|
|
|
|
|
|
|
|
|
X |
X |
|
Coordinator,
consultant |
60913 |
6.09.13 Travail pose tuyaux (200.000m) |
|
|
|
|
|
|
|
|
X |
X |
X |
X |
X |
Consultant,
gypsum specialist, beneficiaries |
60914 |
6.09.14 230 Réservoirs eau à 15m3 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Consultant,
gypsum specialist, beneficiaries |
60915 |
6.09.15 230 Bases réservoirs |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Beneficiaries |
60916 |
6.09.16 Supervision de l'installation/formation des artisans pour entretien |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Consultant,
gypsum specialist, beneficiaries |
60917 |
6.09.17 Magasin pièces détachées pompes.Voir 7.02.08 |
|
|
|
|
|
|
|
|
|
|
X |
X |
X |
Coordinator,
consultant |
60918 |
6.09.18 Installation 230 réservoirs |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Beneficiaries |
60919 |
6.09.19 Entretien installations eau premiers 24 mois |
3 et 4 |
|
|
|
|
|
|
X |
X |
X |
X |
X |
X |
Beneficiaries |
60920 |
6.09.20 37 Installations de purification d'eau pour cliniques et écoles.Voir 7.02.09 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
60921 |
6.09.21 Autres installations purification d'eau (inc.15.000 Wc panneaux solaires) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
60922 |
6.09.22 Équipements de contrôle de la qualité de l'eau.Voir 7.02.20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
60923 |
6.09.23 Services monitorage eau potable premiers 24 mois |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
60924 |
6.09.24 Frais transport Europa-Rep. Togolaise : la plupart de ces transports se réfèrent aux structures en eau potable. Voir 7.03.04 |
|
|
|
|
|
|
|
|
|
X |
X |
|
|
Coordinator+
transport company |
60925 |
6.09.25 Frais transport locaux : la plupart de ces transports se réfèrent aux structures en eau potable. Voir 7.03.05 |
|
|
|
|
|
|
|
|
|
X |
X |
|
|
Coordinator+
transport company |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.09 Structures en eau potable. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.10 Structures éco-sanitaires |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61001 |
6.10.01 Construction premiers 1500 systèmes éco-san (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61002 |
6.10.02 Construction bâtiments premiers 1500 systèmes éco-san (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61003 |
6.10.03 Installation premiers 1500 systèmes éco-san (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61004 |
6.10.04 Monitorage premières installations éco-san (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61005 |
6.10.05 Construction et installation premiers 1500 réservoirs à compostage doméstiques (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61006 |
6.10.06 Construction et installation premiers 1500 jardins verticaux doméstiques (premiers 24 mois) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.10: Structures éco-sanitaires |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.11 Salles études |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61101 |
6.11.01 Construction 189 salles études au niveau des commissions réservoir |
3 et 4 |
|
|
|
|
X |
X |
X |
X |
X |
|
|
|
Beneficiaries |
61102 |
6.11.02 189 systemes éclairage photovoltaïque pour les études. Voir 7.02.10 |
3 et 4 |
|
|
|
|
|
|
X |
X |
X |
X |
|
|
Coordinator,
consultant |
61103 |
6.11.03 Installation 189 systemes éclairage photovoltaïque pour les études |
3 et 4 |
|
|
|
|
|
|
X |
X |
X |
X |
|
|
Beneficiaries |
61104 |
6.11.04 Télévision photovoltaïque pour les études(Exclu du projet) |
3 et 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.11 Structures éco-sanitaires |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.12 Éclairage écoles et cliniques |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61201 |
6.12.01Éclairage photovoltaïque pour les +/-30 écoles.Voir 7.02.11 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
|
61202 |
6.12.02 Installation éclairage photovoltaïque pour les +/-30 écoles |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
61203 |
6.12.03 Éclairage photovoltaïque/installation pour les cliniques dans la zone du projet. Voir 7.02.12 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Coordinator,
consultant |
61204 |
6.12.04 Réfrigération photovoltaïque/installation aux cliniques @ Euro 6000/clinique. Voir 7.02.13 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.12 Éclairage écoles et cliniques |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.13 Structures récolte eau pluviale utilisation doméstique |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61301 |
6.13.01 Construction premiers 200 systèmes de récolte eau pluviale doméstique |
|
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
61302 |
6.13.02 Monitorage premières installations récolte eau (premiers 24 mois) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Beneficiaries |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.13 Structures récolte eau pluviale
utilisation doméstique |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.14 Station radio |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61401 |
6.14.01 Atelier station radio;ammeublement etc.Pro-memorium – exclu du projet |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61402 |
6.14.02 Fonds station radio;achat équipements.Voir 7.02.14.Promemorium – exclu du projet |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.14 Station radio |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.15 Fonds éclairage PV |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
61501 |
6.15.01 Fonds éclairage photovoltaïque ménages;déstinés achats premiers systèmes. Voir 7.02.15.Promemorium - exclu du projet. |
4 et 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 6.15 Fonds éclairage PV |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6. Sous-total Autre |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7. Sous-traitance rélative aux activités de
construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.01 Travaux |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
70101 |
7.01.01 Construction 32 forages à diam. int. 8” 3500m @ Euro 150 |
|
|
|
|
|
|
X |
X |
X |
X |
|
|
|
Well
drilling company |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 7.01Travaux |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.02 Fournitures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
70201 |
7.02.01 Formes et moules pour produits 2 usines. Voir 6.06.04 |
2 et 3 |
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Consultant,
gypsum specialist |
70202 |
7.02.02 Établissement réseau recyclage-assainissement. Moyens transport.Voir 6.07.02 |
|
|
|
|
|
|
X |
X |
|
|
|
|
|
Coordinator |
70203 |
6.09.07 200 Pompes solaires compris boïtiers électroniques Voir 6.09.07 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
70204 |
7.02.04 Panneaux solaires (189*300 W = 56.7 kW)Voir 6.09.09 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
70205 |
7.02.05 96 pompes manuelles entièrement en acier inoxydableVoir 6.09.10 |
|
|
|
|
|
|
|
|
X |
X |
X |
|
|
Coordinator,
consultant |
70206 |
7.02.06 Câbles, tuyaux accessoires pour pompes/puits Voir 6.09.11 |
|
|
|
|
|
|
|
|
|
X |
X |
|
|
Coordinator,
consultant |
70207 |
7.02.07 Tuyaux puits aux réservoirs – 200000m @ Euro 0.75. Voir 6.09.12 |
|
|
|
|
|
|
|
|
|
|
X |
X |
|
Coordinator,
consultant |
70208 |
7.02.08 Magasin pièces détachées pompes Voir 6.09.17 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
70209 |
7.02.09 37 Installations de purification d'eau pour cliniques et écoles (back-up)Voir 6.09.20 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
70210 |
7.02.10 189 systemes éclairage photovoltaïque pour les études.Voir 6.11.02 |
|
|
|
|
|
|
|
X |
X |
X |
|
|
|
Coordinator,
consultant |
70211 |
7.02.11 Éclairage photovoltaïque pour les +/-30 écoles.Voir 6.12.01 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Coordinator,
consultant |
70212 |
7.02.12 Éclairage photovoltaïque/installation pour les cliniques dans la zone du projet. Voir 6.12.03 |
|
|
|
|
|
|
|
|
|
|
|
X |
X |
Coordinator,
consultant |
70213 |
7.02.13 Réfrigération photovoltaïque/installation aux cliniques @ Euro 6000/clinique.Voir 6.12.04 |
|
|
|
|
|
|
|
|
|
|
|
|
X |
Coordinator,
consultant |
70214 |
7.02.14 Fonds station radio;achat équipements.Voir 6.14.02 Pro-memorium (exclu du projet) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
70215 |
7.02.15 Fonds éclairage photovoltaïque ménages;déstinés achats premiers systèmes. Voir 6.15.01.Pro-memorium (exclu du projet) |
4 et 5 |
|
|
|
|
|
|
|
|
|
|
|
|
|
70216 |
7.02.16 Bureaux et mobilier 32 systèmes SEL-LETS.Achats locaux.Voir 6.04.02 |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator,
secretariat |
70217 |
7.02.017 Ordinateur principal systèmes SEL-LETS et back-up.Voir 6.04.03 |
|
|
X |
X |
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
70218 |
7.02.18 60 ordinateurs régistration transactions SEL-LETS (100 transactions/personne/heure).Voir 6.04.04 |
|
|
X |
X |
X |
|
|
|
|
|
|
|
|
Coordinator,
consultant |
70219 |
7.02.19 Alimentation PV 64 systèmes SEL-LETS et accessoires.Voir 6.04.05 |
|
|
X |
X |
X |
|
|
|
|
|
|
|
|
Coordinator,
consultant |
70220 |
7.02.20 Équipements de contrôle de la qualité de l'eau.Voir 6.09.22 |
|
|
|
|
|
|
|
|
|
|
|
|
|
Coordinator,
consultant |
70221 |
7.02.21 Équipements (y comprises presses) pour la production des mini-briquettes.Voir 6.08.03)32 @ Euro 2.500 |
3 et 4 |
|
|
|
|
|
|
|
X |
X |
X |
X |
|
Consultant,
gypsum specialist |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Sous-total 7.02
Fournitures |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.03 Services |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
70301 |
7.03.01 Sub-contractor consultant projets intégrés (niveau pro-diem) 24 mois Voir 1.02.01.01 |
2,3,4 |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Consultant |
70302 |
7.03.01 Sub-contractor consultant cours hygiène 6 mois @ Euro 4.167, voir 1.02.01.02 |
2. |
|
X |
X |
X |
X |
X |
X |
|
|
|
|
|
Hygiene
Consultant |
70303 |
7.03.02 Sub-contractor consultant workshops organisationnels.12 mois @ Euro 4.167.voir 1.02.01.03 |
2 et 3 |
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Workshops
Consultant |
70304 |
7.03.04 Frais transport Europa-Rep. Togolaise : la plupart de ces transports se réfèrent aux structures en eau potable.Voir 6.09.24 |
|
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
X |
Transport
company |
70305 |
7.03.05 Frais transport locaux : la plupart de ces transports se réfèrent aux structures en eau potable. Voir 6.09.25 |
|
|
|
|
|
X |
X |
X |
X |
X |
X |
X |
|
Transport
company |
70306 |
7.03.06 Sub-contractor consultant produits en composites de gypse; atelier organisationnel; mise en place usines 12 mois @ Euro 4.167 voir 1.02.01.04 |
2 et 3 |
|
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
X |
Gypsum
Consultant |