Homepage

The Model

Draft projects

Articles published

Technologies

Annexed material

Downloads

 About Bakens Verzet

STICHTING BAKENS VERZET

1018 AM AMSTERDAM, THE NETHERLANDS

Director,

T.E.(Terry) Manning,

Schoener 50,

1771 ED Wieringerwerf,

The Netherlands.

Tel: 0031-227-604128.

Homepage: http://www.flowman.nl

E-mail: (nameatendofline)@xs4all.nl : bakensverzet

 


MODEL FOR SELF-FINANCING  ECOLOGICAL SUSTAINABLE INTEGRATED RURAL AND POOR URBAN DEVELOPMENT PROJECTS

 FOR THE WORLD'S POOR.

Sustainable fully ecological poverty alleviation in rural and poor urban environments, incorporating an innovative package of social, financial, and productive structures, with basic services necessary for a good quality of life for all, a leading role for women, and  renewable energy applications.

 


 

"Money is not the key that opens the gates of the market but the bolt that bars them."

 

Gesell, Silvio The Natural Economic Order.

Revised English edition, Peter Owen, London 1958, page 228.

 


 

Edition 31: 22 July, 2007.

 


 

Creative Commons License


This work is licensed under a Creative Commons Attribution-Noncommercial-Share Alike 3.0 Licence

 


(EN FRANÇAIS)


 

BLOCKS OF WORKING FILES

Sets of working files are arranged in a logical order for you to work on. As you complete your work on each work file you can change its name by removing the word “work” from its name and copying it to your index of final project files. There is no need to rush this transfer. Until you remove the word “work” from your work file name you possess both the original proposed sample file in your index of final project files for comparison and your own revised version in your index of work files. 

 

Project goals and expected results.

 

4.01 Project goals.

4.02 Long term goals.

4.03 Short term goals.

4.04 Activities related to specific goals.

4.05 Expected results.

4.06 The economic bases of the project.

4.07 Some basic project concepts.

4.08 Five basic conditions.

4.09 A list of the development structures to be created.

4.10 Partners ad co-donors.

4.11 Participating parties.

4.12 The ownership question.

4.13 Certainty as to project execution.

4.14 Taxation of transactions within the local money LETS systems set up.

4.15 How a local money (LETS) transaction works.

4.16 The effects of inflation on reimbursement of the Cooperative Local Development Fund and loan content.

4.17 Project insurance and forfeit in the form of gift in case of loss of capital structures.

4.18 The circulation of  information.

4.19 Recycling of funds and importation of items needed for  productivity increase

4.20 Auditing structures.

 

 BACK:

Main project programme. 

Main menu of the Model. 

Model homepage 

Bakens Verzet homepage