Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128.
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
Sustainable fully
ecological poverty alleviation in rural and poor urban environments,
incorporating an innovative package of social, financial, and productive
structures, with basic services necessary for a good quality of life for all, a
leading role for women, and renewable
energy applications.
"Money is not
the key that opens the gates of the market but the bolt that bars them."
Gesell, Silvio The
Natural Economic Order.
Revised English
edition, Peter Owen, London 1958, page 228.
Edition 01: 26
October, 2007.
This work is licensed under a Creative Commons
Attribution-Noncommercial-Share Alike 3.0 Licence
BLOCKS OF WORKING FILES
Sets of working files are arranged in a logical order for you to work
on. As you complete your work on each work file, you can change its name by
removing the word “work” from its name and copying it to your index of final project files. There
is no need to rush this transfer. Until you remove the word “work” from your
work file name you possess both the original proposed sample file in your index of final project files for
comparison and your own revised version in your index of work files.
Block 6: The phases of project execution.
06.01
Activities schedules per year.
06.02
Activities schedules per quarter.
06.20
Second, workshop execution phase : about 9 months.
06.21
Circulation of funds : see bank circuit chart.
06.22
Creation of the health clubs and hygiene education courses.
06.23
Creation of the local social structures.
06.24
Creation of the local money LETS structures
06.25
Creation of the micro-credit system structures.
06.26
Creation of the gypsum composite production units.
06.27
Creation of the recycling structures.
06.28
Creation of the bio-mass production structures.
06.29
Creation of the structure for the local radio station.
06.30
Creation of the drinking water structures.
06.40 Third,
project execution phase.
06.50
Fourth : monitoring and evaluation phase.
BACK
BACK