Director,
T.E.(Terry)
Manning,
Schoener
50,
1771 ED
Wieringerwerf,
The
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
Incorporating innovative
social, financial, economic, local administrative and productive structures,
numerous renewable energy applications, with an important role for women in
poverty alleviation in rural and poor urban environments.
"Money is not the key that
opens the gates of the market but the bolt that bars them"
Gesell, Silvio The Natural
Economic Order
Revised English edition, Peter
Owen, London 1958, page 228
Edition 11:
The
project involves complex on-going interaction amongst several parties. For the
project to be finished on time, each party must agree to meet his obligations
within the prescribed time. A penalty system may be used in case of late
delivery of goods and services. If any party feels unable to meet the proposed
time line he must say so when the project details are finalised at the start of
phase two. The time line can then be adjusted to suit his needs before work
begins.
Financial
and political participants should each issue a written warranty that money,
permits, and guarantees they have agreed to provide will be forthcoming on
schedule.
As
the project is cooperative in nature, the participating parties, and in
particular those financing the project, are free to impose appropriate reporting
and verification procedures which should be simple and direct to eliminate "red
tape".
Forward: taxation of
transactions under local money systems.
Back: list of
participating parties.
List of drawings and
graphs.
Typical list of maps.
List of key
words.
List of
abbreviations used.
Documents for
funding applications.