MODEL FOR SUSTAINABLE SELF-FINANCING INTEGRATED RURAL AND POOR URBAN DEVELOPMENT FOR THE WORLD'S POOR

Incorporating innovative social, financial, economic, local administrative and productive structures, numerous renewable energy applications, with an important role for women in poverty alleviation in rural and poor urban environments.

 


 

"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 


 

Edition 11: 28 September 2006

 


05.33 THE RECYCLING STRUCTURES

This section refers to the planned recycling structures as a general system. For technical details on the recycling of the various types of organic waste at household level please refer to to 6.26 Recycling structures.

A special fund is included in the budget to cover the costs of setting up the recycling strucutures, which have priority. The funds will be repaid by the beneficiaries in the same way as those made available to the Beosite factories. They will take the form of interest-free credits repayable according to the real possibilities of those involved as decided during the organisational workshops during which the structures are set up. The repayments will be financed by sale of materials such as fertilisers and compost ourside the project area and by the "exportation" of solid non-organic waste which are not recyclable within the project area itself. For an illustration of a possible general structure for the integrated recycling of waste in project areas refer to:

DRAWING OF WASTE DISPOSAL STRUCTURES.

The work of the recycling structures will be carried out within the local money LETS systems already set up. One of the more interesting features of LETS systems is that, in contrast with what happens in the western monetised economies, work considered as "dirty" and/or "heavy" is usually better paid than "clean" and/or "light" work as the rates charged will normally be related to the perceived value of an hour's work in the forseeable normal working situation.

Usually at least two Moraisian workshops will be held. Often, one workshop for each LETS loal money system.

Indicative participation (all workshops together)

The Moraisian trainers
The project coordinator
Consultant Terry Manning
At least one representative of the ONG
Representative of the Finance Ministry
Representative of the Health Ministry
Representative of the Rural Development ministry
At least 5 observers (possible coordinators for future projects)
200 persons (male and female)indicated by the tank commissions, interested in participating.

Duration of each workshop: about six weeks.

The Workshops will be expected to produce the following structures:

a) Definition of the social form of the structures
- statutes
- rules
- professional and administrative structures
- financial aspects including relations with the Micro-credit institution
- relations with the local money LETS systems

b) Analysis of requirements

c) A structure for the recycling centres
- Definition of the land requirements and the physical structures necessary
- formalities and permits
- design of the centres
- construction of the centres
- purchase of the necessary equipment

d) A structure for the collection/deposition of waste
- urine
- composted excreta
- waste water
- other organic waste
- non organic solids
- special industrial wastes
- medical wastes
- who will do what
- definition of individual zones
- definition of specialisations

e) A commercial structures
- definition of the tarrifs applicable to the various types of material
- distribution of urine and composted excreta
- direct recycling of certain materials
- contatcs for the exportation of materials not recyclable locally

f) A monitoring structure
- sanitary conditions
- ecological conditions
- safety conditions

g) A communications structure
- vertical, at project level (coordinator, centre managers, collection structures, end users)
- horizontal, between centres
- relations with local money LETS systems
- commercial, radio, website

 

 


Forward: lighting structures for study purposes.

Back: sanitation structures.


Details on the recycling of organic waste at household level.


Complete index of the Model.


Main menu for the Model.


 

List of drawings and graphs.
Typical list of maps.
List of key words.
List of abbreviations used.
Documents for funding applications.

 


Homepage Bakens Verzet