KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

 

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.03.03 Sublocation 03 Boronyi : village 3 Boronyi

Inhabitants : 140 extended households, 1409  population.
Water supply required @ 25l per day = 35225 litres/day.

Available water supply : none.

There are also:

1 Primary school

1 Clinic

 

Dig new well or borehole.

From the new well/borehole in or around Boronyi, pump a total of 40m3 water per day.

The well/borehole will be fitted with 8 Solar Spring solar pumps
Each of 5 pumps dedicated to a water tank supplying about 280 users.
One pump system for the primary school.
One double pump system for the clinic.

Triple unit reserve hand-pump-system next to the new well.

The new well system equipped with:
The well itself
Photovoltaic panels for overall +/- 2400Wp ( being 32 x 75Wp panels) and supports with multipoint hand-tracking system.
Eight solar pumps with accompanying electronics.
Five 15m3 tanks on tank supports placed in five locations in Boronyi.

One 15m3 tank in the primary school grounds.
Two 15m3 tanks in the precincts of the clinic.

A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.

 


 

Next village :

 

Village 04.1 Nyataro.

 

Return to:

 

02.04 List of villages.

 


 

Next file :

 

03.01 General project background.

 

Back to:

02.03 General information on the Kiogoro project area.

 


 

Complete project index.

 


 

Model Homepage 

 

Bakens Verzet Homepage