KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.09.08 Sublocation 09 Nyaura :  village 8 Gechochi

Inhabitants : 52 extended households, 520 population.
Water supply required @ 25l per day = 13000 litres/day.

Available water supply : 3 private boreholes, excluded from the project.

Drill one new borehole with an internal diameter of at least 8”.

From the new borehole in or around Gechochi, pump a total of 15m3 water per day.

The borehole will be fitted with 2 Solar Spring solar pumps
Each of 2 pumps dedicated to a water tank supplying about 260 users.

Triple unit reserve hand-pump-system next to the new well.

The new well system equipped with:
The well itself
Photovoltaic panels for overall +/- 600Wp ( being 8 x 75Wp panels) and supports with multipoint hand-tracking system.
Two solar pumps with accompanying electronics.
Two 15m3 tanks on tank supports placed in two locations in Gechochi.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.


 

Next village :

 

Village 09.9 Kenyerere.

 

Return to:

 

02.04 List of villages.

 


 