Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.08.01 Sublocation 08 Bobaracho : village 1 Getai
Inhabitants
: 49 extended households, 489
population.
Water supply required @ 25l per day = 12225 litres/day.
Available
water supply : none.
Dig one new well or drill one borehole with an
internal diameter of at least
From the
new well/borehole in or around Getai,
pump a total of 15m3 water per day.
The well/borehole will be fitted with 2 Solar
Spring solar pumps
Each of 2 pumps dedicated to a water tank supplying about 245 users.
Single unit reserve hand-pump-system next to
the new well/borehole.
The new
well/borehole system equipped with:
The well/borehole itself
Photovoltaic panels for overall +/- 600Wp ( being 8 x 75Wp panels) and supports
with multipoint hand-tracking system.
Two solar pumps with accompanying electronics.
Two 15m3 tanks on tank supports placed in two locations in Getai.
A single hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.