KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


05.00 THE ORDER OF SEQUENCE OF PROJECT ACTIVTTIES

05.01 TABLE OF INDICATORS FOR WATER AND SANITATION ACTIVITIES

 

Funding parties and donors usually request that applicants for the financing of projects complete a “table of indicators” with a view to obtaining a quick overview of certain main project features.

 

 

Table of indicators for drinking water supply and sanitation

Beneficiaries / Cost indications / Technical Information / Financial Contribution

 

Type of community

Type of  drinking water installation

Project name                and country

Rural

Yes

X

   

No

 

Hand pumps

Yes

x

No

 

     New Horizons for

             Kiogoro

               Kenya

Small town

Yes

 

No

x

Small self-standing systems

Yes

x

No

 

Urban

Yes

 

No

x

Urban distribution networks

Yes

 

No

x

Beneficiary Population

Cost indications

Technical Information

Financial Contributions

A1

 

B1

 

C1

 

D1

 

E1

 

Number of beneficiaries with access to clean drinking water

: 80.000, being the entire population in the project area.

Formal money content for the improvement of access to clean dinking water in the project area:

 Euro 2.518.490, being about 31.48 % of the total project costs of Euro 8.000.000. The contribution of (financing parties) amounts to about Euro 2.286.790, being about 38,11% of the total formal money contribution of Euro 6.000.000 requested. Since the project is truly integrated following new concepts, these amounts are indicative. The preparation of some water sources, the channelling of feed-pipes,  and the production of  water tanks and supplementary  structures for rain-water harvesting in each of the 8,000 extended family homes are carried out by the inhabitants under the framework of the local financial structures set up during capacitation workshops which themselves are an integral part of the project.

Number of persons served per unit of distributions (hand-pumps, water points,…) 198 hand pumps being 66  triple back-up groups placed near 66 boreholes:  80.000;

 

Photovoltaic systems for distributed drinking water:   80.000;

297                            

People served by bore-holes and drinking water sources for personal use  80.000;

 

people served by 66 washing places :  80.000;

 

people served by rain-water harvesting structures :  80.000

Contribution by way of co-financing  by the NGO responsible : Phase 1 :

The drafting of the project and leading negotiations for the formation of the applicant partnership

Co-financing contribution  by partners : Not yet availablee

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A2

 

B2

 

C2

 

D2

 

E2

 

Number of  beneficiaries with   access to sanitation facilities: 80.000, being the entire population in the project area.  Sanitation structures are also installed in schools, public places, and where necessary in clinics in the project area.

 

Formal money content for the improvement of access to sanitation is Euro 57.000, being 0,7 % of the project total  of Euro 8.000.000.

 

If the cost of the three gypsum composites manufacturing units is included, then the total cost for access to sanitation is Euro 281.250 or about 3,5% of total project costs.

 

Since the project is truly integrated according to new development concepts this amount is indicative. Local production of tanks and eco-sanitation systems for each of the 8.000 extended families and their installation and maintenance are executed by the inhabitants themselves under the framework of the local financial structures set up during capacitation workshops which themselves are an integrated part of the project.

 

 

Average daily distributed drinking water consumption per head of population  is 25 litres per person per day, plus a similar amount available as back-up through reserve hand pumps placed next to  wells and boreholes; plus  15 litres of non-potable water per head for personal use  through rain-water harvesting at household level.

Cash contribution by the beneficiaries : Euro 2.000.000 being 25% of the total project cost of Euro 8.000.000. Most of the works are executed by the beneficiaries themselves within the framework of the social, financial, and productive local structures set up as an integrated part of the project. The project gives permanent work to about 6.000 people, who contribute about

5.333.000 hours of work fully documented and registered work for the execution of the project.

This work is formally converted into Euro at the rate of  Euro 3 per eight-hour working day. The work is effectively paid by the populations within the framework of the local money systems set up.

 

Contribution in kind made by  beneficiaries : not applicable

 

 

 

 

 

A3

 

B3

 

C3

 

D3

 

E3

 

Number of beneficiaries with access to hygiene education:     80.000, being all of the inhabitants in the project area.. In practice, the direct participation of 18.000 women in the 297 Health Clubs set up, and that of all school-going pupils through the institution of on-going hygiene education courses in the schools.

While men are welcome to participate in the activities of the health clubs, relatively little interest is expected during the first few years. 

The amount of formal money invested for hygiene education in the project area is Euro 284.000, being 4,7 % of the total external seed funding  of Euro 6.000.000. Since the project is effectively truly integrated, this is an indicative figure.

The costs of operating the permanent hygiene education structures set up are borne by the inhabitants themselves within the framework of the local financial structures set up during capacitation workshops which are themselves an integral part of the project activities.

 

Total hourly capacity  of clean drinking water expressed in cubic metres per hour supplied through the decentralised solar water distribution structures is expected to be about 89m3/hour (being 2140m3/day/24 hours). A similar quantity of water is available through the back-up hand pump structures installed.

An average of  50m3/hour of rain water will also be harvested for personal uses. Harvested rain-water is not, however considered potable. 

Cofinancing by other donors : not applicable.

Bank loans or other debts : none

 

 

 

 

 

A4

 

B4

 

C4

 

D4

 

E4

 

Average family annual income of the project beneficiaries is said to be Euro 935 per year per extended family of 10 members.

 

The project area is considered to be one of the poorest in Kenya.

 

 

Other formal money costs are about Euro 3.300.000, being about 41 % of the total project costs of Euro 8.000.000. The figure is indicative. It includes the costs for the formation and management of social, financial, and productive structures set up;

297 photovoltaic lighting structures for study purposes; structures for the re-cycling of waste; high-efficiency cookers and mini-briquettes for the cookers.

 

Total annual operation and maintenance costs for the project structures :

Most operation and maintenance activities take place under the local financial structures set up.

The formal money content of these costs is expected to be about  Euro 110.000; this is expected to amount to about 23.5% of the annual formal money contributions (about Euro 466.000)  paid by the beneficiaries into their Cooperative Local Development Fund in the first three years of operation, and 18% of annual formal money contributions  (about Euro 610.000) during the next following period of seven years. 

Formal money co-finance by

(donor) is about Euro 6.000.000 being about 75% of the total project cost of Euro 8.000.000

 

 

 

 

 

 

A5

 

B5

 

C5

 

D5

 

E5

 

Willingness of beneficiaries to pay for their water supply

Expressed in (€/m³) : The monthly contributions made by users to dot refer just to drinking water supply but to the entire range of services at the disposal of the inhabitants.

This contribution amounts to Euro 0,60 per habitant per month, or Euro 6 for each extended family of  10 persons during the first three years, and Euro 7,50 per month for each extended family of ten persons for the next following period of seven years . This contribution is subject to compensation through savings made on present-day outgo in various sectors. For what the indication may be worth, the entire monthly contribution applied to just the solar powered distributed drinking water part of the services provided would yield a cost of  Euro 0,14 per m3 of drinking water. Self-financed replacement of capital goods after 20 years is included in this figure.

    

Total cost of the project : Euro 8.000.000 including monetisation of 5.333.000 hours of work carried out under the local money systems set up. This work has been converted into Euro at a nominal rate of Euro 3 per eight-hour working day, for a total of Euro 2.000.000. This is true co-financing by the local populations, who effectively pay for the local money transactions within the framework of the local money systems set up as integral part of the project.

 

Number of  complete eco-sanitary systems built and installed as part of the project : 8.000 systems.

1000 are expected to be installed during the first two years’ executive period of the project; the rest during the following four years.

Other                                          (specify)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 