KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.10.03 Sublocation 10 Nyanchwa :  village 3 Kenonka

Inhabitants : 230 extended households, 2299 population.
Water supply required @ 25l per day = 57475 litres/day.

Available water supply : none.

Dig two wells or drill two boreholes with an internal diameter of at least 8”.

From the new wells/boreholea in or around Kenonka, pump a total of 60m3 water per day.

The wells/boreholes will each be fitted with 5 Solar Spring solar pumps
Each of 10 pumps dedicated to a water tank supplying about 230 users.

Triple unit reserve hand-pump-system next to the new wells/boreholes.

Each new well/borehole system equipped with:
The well/borehole itself
Photovoltaic panels for overall +/- 1500Wp ( being 20 x 75Wp panels) and supports with multipoint hand-tracking system.
Five solar pumps with accompanying electronics.
Five 15m3 tanks on tank supports placed in five locations in Kenonka.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.


 

Next village :

 

Village 10.4 Administrative.

 

Return to:

 

02.04 List of villages.

 


 