Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.07.03 Sublocation 07 Nyanguru : village 3 Matibo
Inhabitants
: 120 households, 1200 population.
Water supply required @ 25l per day = 30000 litres/day.
Available
water supply : none.
Dig one new well or drill one borehole with an
internal diameter of
From the
new well/borehole in or around Matibo, pump a total of 30m3 water per day.
The well will be fitted with 4 Solar Spring
solar pumps
Each of 4 pumps dedicated to a water tank supplying about 300 users.
Triple unit reserve hand-pump-system next to
the new well.
The new
well system equipped with:
The well itself
Photovoltaic panels for overall +/- 1200Wp ( being 16 x 75Wp panels) and
supports with multipoint hand-tracking system.
Four solar pumps with accompanying electronics.
Four 15m3 tanks on tank supports placed in four locations in Matibo.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.