Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.02.01 Sublocation 02 Matunwa : village 1 Matunwa
Inhabitants
: 110 households, 1100 population.
Water supply required @ 25l per day = 27500 litres/day.
Available
water supply : none.
There are
also:
1 Primary school
1 Secondary school
1 Market
Dig one new well.
From the
new well in or around Matunwa, pump a total of 35m3 water per day.
The well/borehole will be fitted with 7 Solar
Spring solar pumps
Each of 4 pumps each dedicated to a
water tank supplying about 225 users.
One pump installation at the market.
One pump system for the primary school.
One pump system for the secondary school.
Triple unit reserve hand-pump-system next to
the new well.
The new
well system equipped with:
The well itself
Photovoltaic panels for overall +/- 2100Wp ( being 28 x 75Wp panels) and
supports with multipoint hand-tracking system.
Seven solar pumps with accompanying electronics.
Seven 15m3 tanks on tank supports placed in seven locations in Matunwa of which
one in the primary school grounds, one in the secondary school grounds, and one
in the market square..
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.
Next village :
Return to:
Next file :
03.01 General project background.
Back to:
02.03
General information on the Kiogoro project area.