Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.09.01 Sublocation 09 Nyaura : village 1 Mwembe
Inhabitants
: 172 extended households, 1716
population.
Water supply required @ 25l per day = 42900 litres/day.
Available
water supply : 10 private wells, excluded from the project.
There are
also:
2 Primary schools
4 Secondary schools
1 Market
Dig two new wells.
From the
new wells in or around Mwembe, pump a total of 50m3 water per day.
The wells will each be fitted with 7 Solar
Spring solar pumps
Each of 7 pumps dedicated to a water tank supplying about 245 users.
One pump system for each of the primary schools.
One pump system for each of the secondary schools.
One pump system for the market.
Triple unit reserve hand-pump-system next to
each of the new wells.
Each of
the new well systems equipped with:
The well itself
Photovoltaic panels for overall +/- 1800Wp ( being 24 x 75Wp panels) and
supports with multipoint hand-tracking system.
Six solar pumps with accompanying electronics.
Six 15m3 tanks on tank supports placed in six locations in Mwembe of which one
each in the primary school grounds and/or one in each of the secondary school
grounds and/or on in the market square..
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.
Next village :
Return to:
Next file :
03.01 General project background.
Back to:
02.03
General information on the Kiogoro project area.