Homepage

The Model

Draft projects

Articles published

Technologies

Annexed material

Downloads

 About Bakens Verzet

STICHTING BAKENS VERZET

1018 AM AMSTERDAM, THE NETHERLANDS

Director,

T.E.(Terry) Manning,

Schoener 50,

1771 ED Wieringerwerf,

The Netherlands.

Tel: 0031-227-604128

Homepage: http://www.flowman.nl

E-mail: (nameatendofline)@xs4all.nl : bakensverzet

 

 


KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)

 


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.09.01 Sublocation 09 Nyaura :  village 1 Mwembe

Inhabitants : 172 extended households, 1716  population.
Water supply required @ 25l per day = 42900 litres/day.

Available water supply : 10 private wells, excluded from the project.

There are also:

2 Primary schools

4 Secondary schools

1 Market

 

Dig two new wells.

From the new wells in or around Mwembe, pump a total of 50m3 water per day.

The wells will each be fitted with 7 Solar Spring solar pumps
Each of 7 pumps dedicated to a water tank supplying about 245 users.
One pump system for each of the primary schools.
One pump system for each of the secondary schools.
One pump system for the market.

 

Triple unit reserve hand-pump-system next to each of the new wells.

Each of the new well systems equipped with:
The well itself
Photovoltaic panels for overall +/- 1800Wp ( being 24 x 75Wp panels) and supports with multipoint hand-tracking system.
Six solar pumps with accompanying electronics.
Six 15m3 tanks on tank supports placed in six locations in Mwembe of which one each in the primary school grounds and/or one in each of the secondary school grounds and/or on in the market square..
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.


 

Next village :

 

Village 09.2 Nyaura.

 

Return to:

 

02.04 List of villages.

 


 

Next file :

 

03.01 General project background.

 

Back to:

02.03 General information on the Kiogoro project area.

 


 

Complete project index.

 


 

Model Homepage 

 

Bakens Verzet Homepage