Homepage

The Model

Draft projects

Articles published

Technologies

Annexed material

Downloads

 About Bakens Verzet

 

STICHTING BAKENS VERZET

1018 AM AMSTERDAM, THE NETHERLANDS

Director,

T.E.(Terry) Manning,

Schoener 50,

1771 ED Wieringerwerf,

The Netherlands.

Tel: 0031-227-604128

Homepage: http://www.flowman.nl

E-mail: (nameatendofline)@xs4all.nl : bakensverzet

 

 


KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


05.10 DESCRIPTION OF THE PLANNED SOCIAL STRUCTURES

 

05.14 Well commissions

 

WELL COMMISSIONS

 

Every well/bore hole area comprises:
- The well or bore hole itself
- The backup hand pump installation
- The washing area
- The enclosure for PV systems and supports
- A guard system for the PV installations

 

The well commission, elected by the tank commissions, supervises the use of the structures common to the water supply system, and carries out minor maintenance operations such as cleaning washing areas, well areas, and backup hand pump systems. The well commission also regulates use of the well area in case of crisis or calamity. It collectively receives a small monthly payment in the local LETS currency (e.g. the equivalent of EURO 5 per month) which it is free to spend as it wishes. Since women enjoy the greatest benefits from the execution and on-going management of the project, they should provide most of the well commission members.

The well commission will nominate one of its members to liaise with the system maintenance structures set up and with those responsible at tank commission level for maintenance.

The well commissions will nominate a female candidate from their own area to monitor the cooperative inspection of the sanitation, rainwater harvesting, and cooking facilities carried out at tank commission level, and arrange for her training.

 


Next file :

 

05.15 Creation of the project management structure.

 

Back to:

 

05.13 Creation of the tank commissions.

 


 

Complete project index.

 


 

Model Homepage 

 

Bakens Verzet Homepage