INSPECTION AND EVALUATION REPORT FORM

DISTRIBUTION OF REPORT

This report should be completed in triplicate for each pumping unit visited. The first report should be completed on first installation of the pump.

1. The first copy is for the personal responsible for the director of maintenance services
2. The second copy is for the national distributors for statistical purposes
3. The third copy is for the maintenance operator or his office

-Questions marked "A" ("always") must ALWAYS be answered
-Questions marked "V" ("variable") need be answered only the first time the report is prepared and thereafter only where there have been variations to the information previously given.
-Questions marked "M" ("management") must be completed by the coordinating manager

GROUP ONE : PUMP IDENTIFICATION

010AUnit series number                  
011VPump type                  
012VProject reference                  
013AVillage/location                  
014VBorehole/well reference                  
015VDate of installation                  
016MTotal months since installation                  
017VActual static water level in meters                  
018ASeries number this visit                  

GROUP TWO : SYSTEM INFORMATION

020VType/size PV array/wind generator                   
021VDirect or battery driven                   
022VType/series number controller                   
023VType/size/length of electric cable                   
024VType/size/length of feed pipe                   
025VType/model of float switch                   
026VMaximum pump submergence in meters                   
027VTotal head to feed pipe outlet in meters                   
028VHorizontal distance from source to outlet in meters                   
029VType,size and sealing of tank/reservoir                   

GROUP THREE : OPERATOR/ARTISAN

030AName                   
031AAnswering to                   
032AHave you got your maintenance manual with you?                   
033AWhen did you last update your kit?                   
034AMeans of transport used                   
035ALocation last unit visited                   
036ADistance away last unit visited                   
037ALocation next unit to be visited                   
038ADistance away next unit to be visited                   

GROUP FOUR : DETAILS OF VISIT

040ADate this visit                   
041ADate last visit to this unit                   
042ATime this visit began                   
043ATime this visit ended                   
044ATravelling time this visit                   
045MAccumulated time (travelling/work) this unit                   
046AIs this a systenatic preventive maintenance visit?                   
047AIf not,who called you?                   
048AWhen were you called?                   

GROUP FIVE : UTILISATION OF PUMP

050VNumber of people served by pump                   
051VNumber of animals served. Specify which                   
052VCrops/trees served. Specify which                   
053VEstimated average hours' use per day                   
054AEstimated total hours' use since last visit                   
055VEstimated average capacity of pump in liters/min                   
056AEstimated cubic meters pumped since last visit                   
057MEstimated cubic meters pumped this unit                   
058VEstimated average queuing time                   
059VDistance away alternative water source in meters                   

GROUP SIX : SANITATION

060AIs run-off area dry and clean?                   
061AAre the approaches to the collection point dry and clean?                   
062ACondition of tank or reservoir                   
063AAppearance of water                   
064AOdour of water                   
065ATaste of water                   
066VTypes of users' recipients                   
067VCleanliness users' recipients                   
068VPresence of water-borne diseases amongst users                   
069VGeneral state of health of users                   

GROUP SEVEN : GENERAL EXTERNAL SURVEY

070AIs the pump working normally?                   
071AIs the pump working, but not well?                   
072AHas the pump broken down?                   
073AIf so, state period of loss of use in days                   
074MTotal period of loss of use this pump                   
075ACondition of PV/wind generator                   
076VCondition/appearance of controller                   
077VCondition/appearance of electric cable                   
078VCondition/appearance of feed pipe                   
079VCondition/appearance of well/head                   

GROUP EIGHT : PUMP MAINTENANCE

080AController self-diagnostics checked?                   
081AIrregularities LED lights noted?                   
082AWas pump pulled out of well/borehole?                   
083ACondition of feedpipe, cable and safety rope OK?                   
084AWas pump opened?                   
085AWas outlet group dismantled?                   
086AWas valve group dismantled?                   
087AWas pump body group dismantled?                   
088AWere piston groups dismantled?                   
089AWas the motor group opened?                   

GROUP NINE : PARTS REPLACED OR SHOWING WEAR AND TEAR

090ABroken parts replaced (ref. numbers)                   
091ACause of damage if not wear and tear                   
092AParts showing wear and tear replaced (ref.numbers)                   
093AParts showing wear and tear for future replacement (ref.nos)                   
094AOperator's comments                   
095MOperator's fee/tavelling this visit                   
096MFees/travelling paid by/through                   
097MCost of spare parts used this visit                   
098MSpare parts paid by/through                   

GROUP TEN : GLOBAL FINANCIAL SITUATION THIS UNIT

100MTotal operator's fees/travelling costs this unit                   
101MTotal parts costs this unit                   
102MTotal accumulated fees and parts costs this unit                   
103MRelation in % 102 to 057 in euros/m3 water                   
104MRelation in % 102 to 016 in euros/month                   

GROUP ELEVEN : INTERNAL STATISTICAL EVALUATION

110MIs there a servicing contract for this visit?                   
111MAmount collected under service contract                   
112MIs there insurance applicable to this visit?                   
113MAmount collected under the insurance policy                   
114MAmount collected for this visit directly from user                   
115MTotal recovered this visit                   
116MTotal recovered all visits this unit                   
117MNet cost of parts this visit                   
118MTotal net cost of parts this unit                   
119MNet cost artisan/travelling this visit                   
120MTotal net cost artisan/travelling this unit                   
121MTotal outgo costs this unit (118+120)                   
122MNet economic result (116-121) this unit excluding ammortisation                   
123MAccumulated ammortisation of pump set                   
124MAccumulated ammortisation of PV/wind generator/battery                   
125MAccumulated ammortisation of well/borehole costs                   
126MAccumulated system ammortisation (123+124+125)                   
127MAccumulated ammortisation + costs (126+122) this unit                   
128MTotal system costs (127) to cubic meter of water pumped (Net cost artisan/travelling this visit (057)                   
129MTotal system costs (127) per month (016)                   