Homepage

The Model

Draft projects

Articles published

Technologies

Annexed material

Downloads

 About Bakens Verzet

STICHTING BAKENS VERZET

1018 AM AMSTERDAM, THE NETHERLANDS

Director,

T.E.(Terry) Manning,

Schoener 50,

1771 ED Wieringerwerf,

The Netherlands.

Tel: 0031-227-604128

Homepage: http://www.flowman.nl

E-mail: (nameatendofline)@xs4all.nl : bakensverzet

 


MODEL FOR SUSTAINABLE SELF-FINANCING INTEGRATED RURAL AND POOR URBAN DEVELOPMENT FOR THE WORLD'S POOR

Incorporating innovative social, financial, economic, local administrative and productive structures, numerous renewable energy applications, with an important role for women in poverty alleviation in rural and poor urban environments.

 


 

"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 


 

Edition 9: 07 December,2006

 


SOLAR SPRING : MAINTENANCE

Maintenance of the electric cable

The Solar Spring motor runs in a dry environment and it is important that water be kept out of the motor chamber. The cable joint in the motor shroud (358) must be carefully protected at all times in such manner as to be completely water-tight. The pump is supplied with a length of special neoprene electric cable which is specially sealed a) individual wire to wire sheath, b) individual wire sheaths to external sheath and c) external sheath to the cable guide in the motor shroud (358).
Should it ever be necessary to separate the electric cable from the motor shroud (358) the following procedure must be carefully followed :

How to solder the electric cable to the motor shroud (358)

Tools and materials required : Heat gun, cable stripper

Soldering sleeve 1) Cut the cable (363) and make a "fresh" end and clean the cable guide on the motor shroud (358)
2) Strip the outer sheath off the last 20cm of the cable (363)
3) Slide a 20cm length of self-welding sleeve (---) onto the cable (363)
4) Slide a cable stop "O" ring ( ---) onto the cable (363)
5) Push the cable (363) into the cable guide in the motor shroud (358) so that the outer sheath of the cable enters the cable guide.

(Drawing)

6) Weld the shroud end of the self welding sleeve (---) onto the cable guide along the whole length of the cable guide.
7) Fit the cable "O" ring (---) under the self-welding sleeve (---) at a position about 3 centimetres from the un-welded end of the cable sleeve (---)

(Drawing)
8) Weld the rest of the self-welding sleeve (---) onto the electric cable (363) and over the cable "O" ring (---).

(Drawing)

Note : The cable "O" ring serves as a stop, to protect the cable terminals should weight accidentally end up on the electrical cable

Connection of cable to motor

(Schematic drawing showing wires, colours and terminal positions)

(There are drawings in the installation instructions)


Menu for the maintenance of Solar Spring pumps.


Main menu Solar Spring pumps.


Some recommended technologies,


List of attachments to the Model.


Complete index of the Model.


Model Homepage.


Typical list of graphs and drawings.
List of abbreviations used.
List of key words.
Documents for funding applications.


Homepage Bakens Verzet