Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.08.04 Sublocation 08 Bobaracho : village 4 Bobaracho
Inhabitants
: 151 extended households, 1513
population.
Water supply required @ 25l per day = 37825 litres/day.
Available
water supply : none.
There are
also:
2 Primary schools
1 Secondary school
1 clinic
1 market
Dig two new wells or drill two boreholes with
an internal diameter of at least
From the
new wells/boreholes in or around Bobaracho, pump a total of 50m3 water per day.
The wells/boreholes will each be fitted with 5
Solar Spring solar pumps
Each of 4 pumps dedicated to a water tank supplying about 380 users.
One pump system for each of the primary schools.
One pump system for the secondary school.
Two pumps systems for the clinic
One pump system for the market.
Triple unit reserve hand-pump-system next to
the each well/borehole.
Each new
well/borehole system equipped with:
The well/borehole itself
Photovoltaic panels for overall +/- 1500Wp ( being 20 x 75Wp panels) and
supports with multipoint hand-tracking system.
Five solar pumps with accompanying electronics.
Five 15m3 tanks on tank supports placed in five locations in Bobaracho of which
one in each of the primary school grounds and/or one in the secondary school
grounds and/or one in the market square and/or two at the clinic.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.