Homepage

The Model

Draft projects

Articles published

Technologies

Annexed material

Downloads

 About Bakens Verzet

STICHTING BAKENS VERZET

1018 AM AMSTERDAM, THE NETHERLANDS

Director,

T.E.(Terry) Manning,

Schoener 50,

1771 ED Wieringerwerf,

The Netherlands.

Tel: 0031-227-604128

Homepage: http://www.flowman.nl

E-mail: (nameatendofline)@xs4all.nl : bakensverzet

 

 


KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.08.05 Sublocation 08 Bobaracho :  village 5 Komisara

Inhabitants : 67 extended households, 670  population.
Water supply required @ 25l per day = 16750 litres/day.

Available water supply : none.

There are also:

Dig one well or drill one borehole with an internal diameter of at least 8”.

From the new well/borehole in or around Komisara, pump a total of 20m3 water per day.

The well/borehole will be fitted with 2 Solar Spring solar pumps
Each of 2 pumps dedicated to a water tank supplying about 330 users.

Triple unit reserve hand-pump-system next to the new well.

The new well system equipped with:
The well itself
Photovoltaic panels for overall +/- 600Wp ( being 8 x 75Wp panels) and supports with multipoint hand-tracking system.
Two solar pumps with accompanying electronics.
Two tanks on tank supports placed in two locations in Komisara.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.


 

Next village :

 

Village 09.1 Mwembe.

 

Return to:

 

02.04 List of villages.

 


 

Next file :

 

03.01 General project background.

 

Back to:

02.03 General information on the Kiogoro project area.

 


 

Complete project index.

 


 

Model Homepage 

 

Bakens Verzet Homepage