Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.08.05 Sublocation 08 Bobaracho : village 5 Komisara
Inhabitants
: 67 extended households, 670
population.
Water supply required @ 25l per day = 16750 litres/day.
Available
water supply : none.
There are
also:
Dig one well or drill one borehole with an
internal diameter of at least
From the
new well/borehole in or around Komisara, pump a total of 20m3 water per day.
The well/borehole will be fitted with 2 Solar
Spring solar pumps
Each of 2 pumps dedicated to a water tank supplying about 330 users.
Triple unit reserve hand-pump-system next to
the new well.
The new
well system equipped with:
The well itself
Photovoltaic panels for overall +/- 600Wp ( being 8 x 75Wp panels) and supports
with multipoint hand-tracking system.
Two solar pumps with accompanying electronics.
Two tanks on tank supports placed in two locations in Komisara.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.
Next village :