KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


06.00 THE PHASES OF PROJECT EXECUTION

06.26 : THE PRODUCTION UNITS FOR ITEMS MADE FROM GYPSUM COMPOSITES

The organisation workshops foreseen will decide where the gypsum composites production units will be constructed.

Consideration should be given to the distance of the sites from the gypsum or anhydrite deposits which will feed them. These site will be included on the maps of the project area.

The costs of locating gypsums/anhydrite deposits are covered as a separate item in the budget.

Information on gypsum composite products.
Preparation of gypsum composite products
.

One Moraisian organisational workshop will be held for the three production units planned together. Localities for the units will be decided in accordance with the local availability of gypsum or anhydrite or the need to import it into the project area. Indicatively one might be located in Nyanchwa, one in   Bobaracho and one in Nyaguta.

 

Indicative participation :

 

The Moraisian trainers
A member of the project coordination team
Consultant for gypsum composites.
At least one representative of the NGO Project New Horizons for Kiogoro
Representative of the Ministry of Health
Representative of the Rural Development ministry
At least 5 observers (possible coordinators for future projects)
66 persons (men and women), indicated during meetings held at Well Commission level, interested in participating in the activities of the factories. Where opportune, according to local political structures and traditions, up to 25% of the people could be indicated by the local chiefs.

 

Duration of the workshop: about six weeks.

 

The Workshop will be expected to produce the following structures:

 

a) Definition of the social form of the production units
- statutes
- rules
- professional and administrative structures
- financial aspects
- relationship with the local LETS systems

 

b) A structure for the supply of materials
- geological research for gypsum and/or anhydrite deposits
- locations of gypsum/anhydrite quarries, permits
- activities preparatory to exploitation
- logistics
- coordination of materials depots with the factories

 

c) Definition of the items to be made (tanks, toilets, stoves, solar cookers etc)
- coordination with the other production units (specialisation)
- contacts with families
- definition of requirements : articles and specifications
- definition of requirements : design, productive capacity
- definition of the necessary procedures
- preparation of moulds
- tests
- decision on priorities to be given to the various items

 

d) A structure for the factories
- land and necessary structures
- design of factories
- construction of factories
- purchase of necessary equipment

 

e) A production structure
- organisation of the production
- commercial organisation

 

f) A structure for the installation of the items produced
- Relationship factory-installers
- Preparation of the installers
- Installation
- Siting of boreholes/wells
- After sales backup and service

 

g) A structure for communications
- Vertical, at project level (Cooperative for Kiogoro, project coordination team, factory manager, factory commissions, installers, end users)
- Horizontal, between production units
- With the local money LETS systems
- Commercial, radio, website

 