Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The Netherlands.
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
02.04 LIST OF VILLAGES IN THE PROJECT AREA
02.04.09.07 Sublocation 09 Nyaura : village 7 Kiamabundu
Inhabitants
: 250 extended households, 2500
population.
Water supply required @ 25l per day = 62500 litres/day.
Available
water supply : none.
There are
also:
1 Primary school
1 Secondary school
Dig two new wells or drill two boreholes with
an internal diameter of at least
From the
new wells/boreholes in or around Kiamabundu, pump a total of 65m3 water per
day.
Each well/borehole will be fitted with 5 Solar
Spring solar pumps
Each of 8 pumps dedicated to a water tank supplying about 310 users.
One pump system for the primary school.
One pump system for the secondary school.
Triple unit reserve hand-pump-system next to
the new wells/boreholes.
Each new
well/borehole system equipped with:
The well/borehole itself
Photovoltaic panels for overall +/- 1500Wp ( being 20 x 75Wp panels) and
supports with multipoint hand-tracking system.
Five solar pumps with accompanying electronics.
Five 15m3 tanks on tank supports placed in five locations in Kiamabudu of which
one in the primary school grounds and one in the secondary school grounds.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.
Next village :
Return to:
Next file :
03.01 General project background.
Back to:
02.03
General information on the Kiogoro project area.