KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


 

02.00 GEOGRAPHIC INFORMATION. 

 

02.04 LIST OF VILLAGES IN THE PROJECT AREA

 

02.04.08.03 Sublocation 08 Bobaracho :  village 3 Nyankoba

Inhabitants : 200 households, 2000 population.
Water supply required @ 25l per day = 50000 litres/day.

Available water supply : none.

Dig one new well or drill one borehole with an internal diameter of at least 8”.

From the new well”/borehole in or around Nyankoba, pump a total of 50m3 water per day.

The well/borehole will be fitted with 8 Solar Spring solar pumps
Each of 8 pumps dedicated to a water tank supplying about 250 users.

Triple unit reserve hand-pump-system next to the new well.

The new well/borehole system equipped with:
The well/borehole itself
Photovoltaic panels for overall +/- 2400Wp ( being 32 x 75Wp panels) and supports with multipoint hand-tracking system.
Eight solar pumps with accompanying electronics.
Eight 15m3 tanks on tank supports placed in eight locations in
Nyankoba.
A triple hand-pump system as backup.
A Hand-pump platform.
Washing place.
Fence or similar around PV panels.
Paths for users.
Sink pits for water drainage.


 

Next village :

 

Village 08.4 Bobaracho.

 

Return to:

 

02.04 List of villages.

 


 