MODEL FOR SUSTAINABLE SELF-FINANCING INTEGRATED RURAL AND POOR URBAN
DEVELOPMENT FOR THE WORLD'S POOR
Incorporating
innovative social, financial, economic, local administrative and productive
structures, numerous renewable energy applications, with an important role for
women in poverty alleviation in rural and poor urban environments.
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The Natural Economic Order
Revised English
edition, Peter Owen,
Edition 12: 20
December, 2006
Chapitre 07: La
justification financière du projet.
|
Deuxième année |
||||||
Voix bilan |
Dépenses |
Phase |
Bailleurs de
fonds en € |
Heures travail local |
Contriblocale @ € 3/jour |
Contrib. Naabi-Aba |
Total en € |
|
|
|
|
|
|
|
|
|
1. Ressources
Humaines |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Le projet mobilise de façon
innovatrice directement des milliers de personnes (4000 environ), soit le 10%
environ du total des résidents adults dans la zone du projet. Ces personnes trouvent
occupation dans le cadre des structures financières locales mises en place
pendant les premiers mois de l’exécution du projet. Personne ne travaille
gratuitement. Tout le monde est payé pour ce qu’il fait au bénéfice des
habitants. Le personnel local est payé en monnaie formelle pendant les tout
premiers 6 mois, puis dans les monnaies locales établies. Elles sont
monétisées en Euros au taux de Euro 3 par journée de travail de 8 heures.En
principe, la population locale fait le travail. La plupart des fonds en Euro
sont destinées aux biens d’investissement pour les structures créées.Il
s’agit d’un total de 425.000 jours de travail environ, (pour cette deuxième
année 260.000 jours environ) pour une valeur de Euro 1.250.000 (pour cette deuxième année Euro 780.000
environ), pour une valeur de Euro 1.250.000, environ soit le 25% du montant
du projet, en forme de co-financement. |
|
|
|
|
|
|
|
1.01 Salaires (montants
brut, personnel local) |
|
|
|
|
|
|
|
1.01.01 Technique |
|
|
|
|
|
|
1010101 |
1.01.01.01 Coordonnateur
(niveau pro-diem) 24 mois |
2,3,4 |
66065 |
0 |
0 |
0 |
66065 |
|
1.01.2
Administratif/personnel soutien salaire en monnaie formelle pendant les premiers
6 mois; puis en monnaie locale |
|
|
|
|
|
|
1010201 |
1.01.02.01 Assistant bureau
1 (local-parle francais)6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010202 |
1.01.02.02 Assistant bureau
2 (local- parle francais)6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010203 |
1.01.02.03 Traducteur pour consultant (local),
parle langue locale et francais 6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
|
Gardiens
: service 24 sur 24 |
|
|
|
|
|
|
1010204 |
1.01.02.04 Gardien 1 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010205 |
1.01.02.05 Gardien 2 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010206 |
1.01.02.06 Gardien 3 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010207 |
1.01.2.07 Gardien 4 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010208 |
1.01.02.08 Gardien 5 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010209 |
1.01.02.09 Gardien 6 (parle francais) local 6 mois formel; 18 mois
local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
|
Chauffeurs |
|
|
|
|
|
|
1010210 |
1.01.02.10 Chauffeur 1
(parle francais) local 6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010211 |
1.01.02.11 Chauffeur 2
(parle francais) local 6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010212 |
1.01.02.12 Chauffeur 3
(parle francais) local 6 mois formel; 18 mois local |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
1010213 |
1.01.02.13 Jardinier pour
recyclage urines et compost |
2,3,4 |
0 |
2133 |
800 |
0 |
800 |
|
Supervision projet |
|
|
|
|
|
|
1010214 |
1.01.02.14 Superviseur AGPA
(demandeur) 24 mois@ Euro 1200 |
2/3/4/5 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Montant total 1.01 |
|
66065 |
27733 |
10400 |
0 |
76465 |
|
|
|
|
|
|
|
|
|
1.02 Salaires (montants
bruts, personnel expatrié/international) |
|
|
|
|
|
|
1020101 |
1.02.01.01 Sub-contractor
consultant projets intégrés (niveau pro-diem) 24 mois. Voir 7.03.01
|
2,3,4 |
0 |
0 |
0 |
0 |
0 |
1020102 |
1.02.01.02 Sub-contractor consultant
cours hygiène 6 mois @ Euro 4.167, voir 7.03.02 |
2,3,4 |
0 |
0 |
0 |
0 |
0 |
1020103 |
1.02.01.03 Sub-contractor
consultant workshops organisationnels.12 mois @ Euro 4.167.Voir 7.03.03 |
2,3,4 |
0 |
0 |
0 |
0 |
0 |
1020104 |
1.02.01.04 Sub-contractor atelier
organisationnel composites en gypse et mise en place usines.12 mois@ Euro
4.167. Voir 7.03.06 |
2,3,4 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
|
Montant total 1.02 |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
1.03 Per diems pour
missions/voyages |
|
|
|
|
|
|
|
1.03.01 A l’étranger
(personnel affecté à l’action) |
|
0 |
0 |
0 |
0 |
0 |
|
1.03.02 Sur place
(personnel affecté à l’action) |
|
0 |
0 |
0 |
0 |
|
1030201 |
1.03.02.01 Sub-contractor
cours hygiène 180 jours @
Euro 65 |
2 |
0 |
0 |
0 |
0 |
0 |
1030202 |
1.03.02.2
Sub-contractor ateliers Moraisiens 360
jours @ Euro
65 |
2 |
0 |
0 |
0 |
0 |
0 |
1030203 |
1.03.02.3 Sub-contractor
production en composites de gypse 360 jours @ Euro 65 |
2 |
23400 |
0 |
0 |
0 |
23400 |
|
1.03.03 Participants aux
séminaires/conférences |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Montant total 1.03 |
|
23400 |
0 |
0 |
0 |
23400 |
|
|
|
|
|
|
|
|
|
1.04 Contribution en
travail des bénéficiaires finaux.Presque tout le travail pour le projet est
effectué par les habitants mêmes.Le projet mobilise de façon innovatrice
directement et crée des emplois permanents pour des milliers de personnes
(4000 environ), soit le 10% environ du total des résidents adults dans la
zone du projet. Ces personnes trouvent occupation dans le cadre des
structures financières locales mises en place pendant les premiers mois de
l’exécution du projet. Personne ne travaille gratuitement. Tout le mond est
payé pour ce qu’il fait au bénéfice des habitants. Le personnel local est
payé en monnaie formelle pendant les tout premiers 6 mois, puis dans les
monnaies locales établies. Chaque transaction est dûment régistrée et
décrivée. Les participations des habitants sont décrivées par action à la
section 4.Elles sont monétisées en Euros au taux de Euro 3 par journée de
travail de 8 heures.Il s’agit d’un total de 425.000 jours de travail, (pour
cette deuxième année 260.000 environ) pour une valeur de Euro 1.250.000 ,
(pour cette deuxième année Euro 780.000 environ) soit le 25% du montant du projet, en forme de co-financement.Ces contributions sont détaillées à la
section 6 du bilan. Elles sont listées ici selon les instructions formelles |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Montant total 1.04 |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
1.SOUS-TOTAL
RESSOURCES HUMAINES |
|
89465 |
27733 |
10400 |
0 |
99865 |
|
|
|
|
|
|
|
|
|
(Ressources humaines,
comprises les contributions des populations indiquées à la section 6 du
bilan) |
|
(89465) |
(2074933) |
(778100) |
(0) |
(867565) |
|
|
|
|
|
|
|
|
|
2. Voyages |
|
|
|
|
|
|
|
2.01 Voyages
internationaux. |
|
|
|
|
|
|
20101 |
2.01.01 Consultant projets
intégrés Amsterdam-Niamey 6 vols sur 24 mois @ Euro 2.500 |
2,3,4 |
5000 |
0 |
0 |
0 |
5000 |
20102 |
2.01.02 Sub-contractor
hygiène Nairobi (?)-Niamey 4 vols sur 6 mois @ Euro 1.500 |
2 |
0 |
0 |
0 |
0 |
0 |
20103 |
2.01.03 Sub-contractor wokshops ogranisationnels Johannesburg (?)-Niamey. 6 vols
sur 12 mois @ Euro 1.500 |
2 |
0 |
0 |
0 |
0 |
0 |
20104 |
2.01.04 Sub-contractor
atelier et usines produits composites de gypse.Amsterdam-Niamey.
4 vols sur 12 mois @ Euro 2.500 |
3 et 4 |
10000 |
0 |
0 |
0 |
10000 |
|
|
|
|
|
|
|
|
|
Montant total 2.01 |
|
15000 |
0 |
0 |
0 |
15000 |
|
|
|
|
|
|
|
|
|
2.02 Trajets locaux |
|
|
|
|
|
|
20201 |
2.02.01 Trajets zone-projet
Makalondi – Niamey. 8 voyages par mois sur 24 mois.192 voyages (Voir 4.01) |
2,3,4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Montant total 2.02 |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
2. SOUS-TOTAL VOYAGES |
|
15000 |
0 |
0 |
0 |
15000 |
|
|
|
|
|
|
|
|
|
3. Matériel,
véhicules et fournitures. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3.01 Achat ou location
de véhicules. |
|
|
|
|
|
|
30101 |
3.01.01 Voiture (1)
traction 4 roues |
2 |
0 |
0 |
0 |
0 |
0 |
30102 |
3.01.02 Voiture (2)
traction 4 roues |
2 |
0 |
0 |
0 |
0 |
0 |
30103 |
3.01.03 Autobus (1) pour
workshops.Il sera cédé (emprunt sans intérets) à une coopérative de transport public local dans la deuxième année dans le
cadre du système micro-crédits établi. |
2 |
0 |
0 |
0 |
0 |
0 |
30104 |
3.01.04 Autobus (2) pour
workshops.Il sera cédé (emprunt sans intérets) à une coopérative de transport public local dans la deuxième année dans le
cadre du système micro-crédits établi. |
2 |
0 |
0 |
0 |
0 |
0 |
30105 |
3.01.05 Pick-up pour
entretien et structures fourniture en eau. Il sera cédé (emprunt sans
intérets) par la suite à la cooperative entretien installations eau potable. |
2 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 3.01 achat ou
location de véhicules |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
3.02 Moblier, matériel
d’ordinateur |
|
|
|
|
|
|
30201 |
3.02.01 Mobilier bureaux |
2 |
0 |
0 |
0 |
0 |
0 |
30202 |
3.02.02 Ordinateurs bureaux
(4 @ Euro 2000) |
2 |
0 |
0 |
0 |
0 |
0 |
30203 |
3.02.03 Printers (2) pour
ordinateurs |
2 |
0 |
0 |
0 |
0 |
0 |
30204 |
3.02.04 Photocopieur (avec
back-up) |
2 |
0 |
0 |
0 |
0 |
0 |
30205 |
3.02.05 Éclairage
/conditionnement photovoltaique salle ordinateurs (5 sets – 1 backup) |
2 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 3.02 moblier,
matériel d’ordinateur |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
3.03 Pièces détachées/
matériel pour machines, outils |
|
|
|
|
|
|
30301 |
3.03.01 Pièces détachées
pour véhicules 5 véhicules x Euro 1000 par an |
2,3,4 |
5000 |
0 |
0 |
0 |
5000 |
30302 |
3.03.02 Pièces détachées
pour équipement de bureau 8 items x Euro 200 par an
x 2 ans |
2,3,4 |
1600 |
0 |
0 |
0 |
1600 |
|
|
|
|
|
|
|
|
|
Sous-total 3.03 pièces
détachées/ matériel pour machines, outils |
|
6600 |
0 |
0 |
0 |
6600 |
|
|
|
|
|
|
|
|
|
3.04 Autre (préciser) |
|
|
|
|
|
|
|
3.04.01 Mobilier et
équipement pour ateliers Moraisiens |
|
|
|
|
|
|
3040101 |
3.04.01.01 Mobilier
ateliers (local) |
2 |
0 |
0 |
0 |
0 |
0 |
3040102 |
3.04.01.02 Équipement
didactique pour workshops (tableau noir; écran projection etc) |
2 |
0 |
0 |
0 |
0 |
0 |
3040103 |
3.04.01.03 Ordinateur
projections Powerpoint |
2 |
0 |
0 |
0 |
0 |
0 |
3040104 |
3.04.01.04 Projecteur |
2 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 3.04 autre |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
3. SOUS-TOTAL MATÉRIEL,
VÉHICULES ET FOURNITURES. |
|
6600 |
0 |
0 |
0 |
6600 |
|
|
|
|
|
|
|
|
|
4. Bureau local/coûts
de l’action |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
4.01 Coût du/des
véhicules |
|
|
|
|
|
|
40101 |
4.01.01 Voiture (1)
traction 4 roues.100km/jour x 300 jours.30000 km @ Euro 0,25 |
2,3,4 |
7500 |
0 |
0 |
0 |
7500 |
40102 |
4.01.02 Voiture (2)
traction 4 roues.100km/jour x 300 jours.30000 km @ Euro.0.25 |
2,3,4 |
7500 |
0 |
0 |
0 |
7500 |
40103 |
4.01.03 Autobus
(1).100km/jour x 350 jours.35000 km @ 0.40 |
2 |
0 |
0 |
0 |
0 |
0 |
40104 |
4.01.04 Autobus
(2).100km/jour x 350 jours. |
2 |
0 |
0 |
0 |
0 |
0 |
40105 |
4.01.05 Pickup.110km/jour x
300 jours.33000 km @ Euro 0.30 |
2,3,4 |
10000 |
0 |
0 |
0 |
10000 |
40106 |
4.01.06 Voiture superviseur
Naabi-aba 50km/jour x 300 jours @ Euro 0.26 (environ). |
2.3,4,5 |
3950 |
0 |
0 |
0 |
3950 |
|
|
|
|
|
|
|
|
|
Sous-total 4.01 Coût
du/des véhicules |
|
28950 |
0 |
0 |
0 |
28950 |
|
|
|
|
|
|
|
|
|
4.02 Location des
bureaux .(achat bureaux) |
|
|
|
|
|
|
40201 |
4.02.01 Achat base
permanente du projet (propriété inalienable du projet au nom de la commission
centrale du projet): bureaux : 200m2;
terrain: 3000m2.
Le bureau restera actif pendant un temps indédéterminé suite à la
phase exécutive du projet. La phase nommée “exécutive” du projet
est celle de la formation des structures sociales, financières et productives
prévues. Toutes les structures elles-mêmes sont permanentes. |
2 |
0 |
0 |
0 |
0 |
0 |
|
4.02.02 Structures pour ateliers
Moraisiens. Terminés les travaux des ateliers, les structures deviendront le
dépôt central du projet.
Les structures hygiéniques seront mises à la disposition de la
population locale pour exploitation dans un lieu public dans le cadre des
structures financières locales mises en place.
Les structures en eau potable seront mises à la disposition de la
population locale. |
|
|
|
|
|
|
4020201 |
4.02.02.01 Structuur
(500m2) pour ateliers |
2 |
0 |
0 |
0 |
0 |
0 |
4020202 |
4.02.02.02 Construction
zone sanitaire pour ateliers |
2 |
0 |
0 |
0 |
0 |
0 |
4020203 |
4.02.02.03 Structures
assainissement éco-san pour ateliers (10 toilettes) |
2 |
0 |
0 |
0 |
0 |
0 |
4020204 |
4.02.02.04 Construction
zone cuisines pour ateliers |
2 |
0 |
0 |
0 |
0 |
0 |
4020205 |
4.02.02.05 Construction
crèche enfants pour utilisation pendant les ateliers. |
2 |
0 |
0 |
0 |
0 |
0 |
4020206 |
4.02.02.06 Forage pour
fourniture en eau pour atelier forage 100m x Euro 150.(6m3 par jour) |
2 |
0 |
0 |
0 |
0 |
0 |
4020207 |
4.02.02.07 Pompe immergée
solaire pour ateliers |
2 |
0 |
0 |
0 |
0 |
0 |
4020208 |
4.02.02.08 Panneaux solaires
+ support pour pompe atelier (400Wc) |
2 |
0 |
0 |
0 |
0 |
0 |
4020210 |
4.02.02.10 Système à
énergie photovoltaique pour ateliers (400Wc) |
2 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 4.02 Structures
pour ateliers Moraisiens. |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
4.03
Consommables-Fournitures de bureau |
|
|
|
|
|
|
40301 |
4.03.01 Papier, toner, CD’s
(vides) et fourniture générale pour bureaux. Fourniture initiale Euro 200, 24
mois @ Euro 100. Achats locaux. |
2,3,4 |
1200 |
0 |
0 |
0 |
1200 |
|
|
|
|
|
|
|
|
|
Sous-total 4.03
Consommables-Fournitures de bureau |
|
1200 |
0 |
0 |
0 |
1200 |
|
|
|
|
|
|
|
|
|
4.04 Autres services (tél./ électricité/ chauffage/ maintenance) |
|
|
|
|
|
|
40401 |
4.04.01 Téléphones
mobiles.24 mois @ Euro 200. Frais locaux. |
2,3,4 |
2400 |
0 |
0 |
0 |
2400 |
40402 |
4.04.02 Électricité –
compte tenue utilisation aussi des structures photovoltaïques prévues.24 mois
@ Euro 100. Frais locaux. |
2,3,4 |
1200 |
0 |
0 |
0 |
1200 |
40403 |
4.04.03 Maintenance.24 mois
@ 17 heures (environ) |
2,3,4 |
0 |
200 |
75 |
0 |
75 |
40404 |
4.04.04 Permis et
formalités. Frais locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 4.04 Autres
services |
|
3600 |
200 |
75 |
0 |
3675 |
|
|
|
|
|
|
|
|
|
4. SOUS-TOTAL BUREAU
LOCAL/COÛTS DE L’ACTION |
|
33750 |
200 |
75 |
0 |
33825 |
|
|
|
|
|
|
|
|
|
5. Autres coûts,
services |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
5.01 Publications |
|
|
|
|
|
|
50101 |
5.01.01 Préparation,
rédaction et publications dessins et spécifications finaux sur place. Frais
locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
|
5.02 Études, recherches |
|
|
|
|
|
|
50201 |
5.02.01 Études
environnement : lois (à fournir). Rapports.Frais locaux. |
2,5 |
2500 |
0 |
0 |
0 |
2500 |
|
5.03 Coûts d’audit |
|
|
|
|
|
|
50301 |
5.03.01 Coûts d’audit. 3
ans x Euro 2.000 dont deux pendant la deuxième année. Frais locaux. |
3,4,5 |
4000 |
0 |
0 |
0 |
4000 |
|
5.04 Coûts d’évaluation |
|
|
|
|
|
|
50401 |
5.04.01 Évaluation fin
projet |
5 |
3000 |
0 |
0 |
0 |
3000 |
50402 |
5.04.02 Rapports évaluation
périodique. 8 rapports x Euro 250, dont 4 pendant la deuxième année) |
2,3,4 |
1000 |
0 |
0 |
0 |
1000 |
|
5.05 Traduction,
interprètes |
|
|
|
|
|
|
|
5.06 Services financiers |
|
|
|
|
|
|
50601 |
5.06.01 Garanti bancaire :
Naabi-Aba Euro 1.500.000 @ 2.5 pro-mille |
|
0 |
0 |
0 |
0 |
0 |
50602 |
5.06.02 Frais bancaires |
|
100 |
0 |
0 |
0 |
100 |
|
5.07 Coûts des conférences/séminaires |
|
|
|
|
|
|
|
5.08 Actions de visibilité |
|
|
|
|
|
|
|
5.09 Assurances |
|
|
|
|
|
|
50901 |
5.09.01 Résponsibilité
civile tiers.(véhicules – bureaux - ateliers) Euro 1.000.000 2.5 pro-mille
par an. |
2/3/4/5 |
2500 |
0 |
0 |
0 |
2500 |
50902 |
5.09.02 Tous risques
travaux - assurance pas retenue nécessaire |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
5. SOUS-TOTAL AUTRES
COÛTS, SERVICES |
|
13100 |
0 |
0 |
0 |
13100 |
|
|
|
|
|
|
|
|
|
6.Autre (spécifier) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
6.01 Formation clubs
d’hygiène |
|
|
|
|
|
|
60101 |
6.01.01 Atelier – Clubs
Santé:participation femmes. (Monnaies locales pas encore en place) |
2 |
0 |
0 |
0 |
0 |
0 |
60102 |
6.01.02 Formation 220 clubs
santé : participation femmes.(Monnaies locales pas encore en place) |
2 |
0 |
0 |
0 |
0 |
0 |
60103 |
6.01.03 Matériel pour 220
clubs santé. (Petits achats locaux) |
2 |
0 |
0 |
0 |
0 |
0 |
60104 |
6.01.04 Formation
animatrices 220 clubs santé.Participation femmes.(Monnaies locales pas encore
en place) |
2 |
0 |
0 |
0 |
0 |
0 |
60105 |
6.01.05
Gestion/vérification santé premiers 24 mois |
2,3,4 |
0 |
60000 |
22500 |
0 |
22500 |
|
|
|
|
|
|
|
|
|
Sous-total 6.01 :
Formation clubs d’hygiène |
|
0 |
60000 |
22500 |
0 |
22500 |
|
|
|
|
|
|
|
|
|
6.02 Cours éducation à
l’hygiène aux écoles |
|
|
|
|
|
|
60201 |
6.02.01 Atelier- Cours
éducation à l’hygiène aux écoles.Participants.(Monnaies locales pas encore en
place) |
2 |
0 |
0 |
0 |
0 |
0 |
60202 |
6.02.02 Matériel de cours
hygiène aux écoles.Petits achats locaux |
2 |
0 |
0 |
0 |
0 |
0 |
60203 |
6.02.03 Gestion/
vérification cours éducation à l’hygiène aux écoles premiers 24 mois |
2,3,4 |
0 |
12000 |
4500 |
0 |
4500 |
|
|
|
|
|
|
|
|
|
Sous-total 6.02 |
|
0 |
12000 |
4500 |
0 |
4500 |
|
|
|
|
|
|
|
|
|
6.03 Structures sociales
locales |
|
|
|
|
|
|
60301 |
6.03.01 Atelier- Structures
sociales locales.Premières participations, jusqu’ à la création des
structures financières locales. |
2 |
0 |
0 |
0 |
0 |
0 |
60302 |
6.03.02 Gestion structures
sociales 220 commissions réservoir premiers 24 mois |
2,3,4 |
0 |
270000 |
101250 |
0 |
101250 |
60303 |
6.03.03 Gestion structures
sociales 46 commissions forage premiers 24 mois |
2,3,4 |
0 |
60000 |
22500 |
0 |
22500 |
60304 |
6.03.04 Gestion structures
sociales administration centrale premiers 24 mois |
2,3,4 |
0 |
8000 |
3000 |
0 |
3000 |
|
|
|
|
|
|
|
|
|
Sous-total 6.03 |
|
0 |
338000 |
126750 |
0 |
126750 |
|
|
|
|
|
|
|
|
|
6.04 Structure systèmes
SEL-LETS |
|
|
|
|
|
|
60401 |
6.04.01 Atelier- Systèmes SEL-LETS.Premières
participations, jusqu’ à la création des structures financières locales |
2 |
0 |
0 |
0 |
0 |
0 |
60402 |
6.04.02 Bureaux et mobilier
46 systèmes SEL-LETS.Achats locaux. Voir 7.02.16 |
2 |
0 |
0 |
0 |
0 |
0 |
60403 |
6.04.03 Ordinateur
principal systèmes SEL-LETS et back-up. Voir 7.02.17 |
2 |
0 |
0 |
0 |
0 |
0 |
60404 |
6.04.04 100 ordinateurs
régistration transactions SEL-LETS (100 transactions/personne/heure). Voir 7.02.18 |
2 |
0 |
0 |
0 |
0 |
0 |
60405 |
6.04.05 Alimentation PV 92
systèmes SEL-LETS.Voir 7.02.19 |
2 |
0 |
0 |
0 |
0 |
0 |
60406 |
6.04.06.Gestion 220
structures SEL-LETS.niveau réservoir premiers 24 mois |
2,3,4 |
0 |
130000 |
48750 |
0 |
48750 |
60407 |
6.04.07 Gestion 46 structures
SEL-LETS.niveau forage premiers 24 mois |
2,3,4 |
0 |
42000 |
15750 |
0 |
15750 |
60408 |
6.04.08 Gestion
registration transactions SEL-LETS niveau forage premiers 24 mois |
2,3,4 |
0 |
84000 |
84000 |
0 |
84000 |
60409 |
6.04.09 Gestion centrale
structures SEL-LETS premiers 24 heures |
2,3,4 |
0 |
8000 |
8000 |
0 |
8000 |
|
|
|
|
|
|
|
|
|
Sous-total 6.04 |
|
0 |
264000 |
99000 |
0 |
99000 |
|
|
|
|
|
|
|
|
|
6.05 Système
Micro-crédit |
|
|
|
|
|
|
60501 |
6.05.01 Atelier - Système
Micro-crédit.Petits achats locaux |
2 |
0 |
0 |
0 |
0 |
0 |
60502 |
6.05.02 Bureau et
équipement système Micro-crédit.Frais locaux prévus. |
2 |
0 |
0 |
0 |
0 |
0 |
60503 |
6.05.03 Gestion structures
micro-crédit niveau 220 réservoirs
premiers 24 mois |
2,3,4 |
0 |
58000 |
24750 |
0 |
21750 |
60504 |
6.05.04 Gestion structures
micro-crédit niveau 46 forages/puits
premiers 24 mois |
2,3,4 |
0 |
20000 |
7500 |
0 |
7500 |
60505 |
6.05.05 Gestion structures
micro-crédit niveau central premiers
24 mois |
2,3,4 |
0 |
8000 |
3000 |
0 |
3000 |
|
|
|
|
|
|
|
|
|
Sous-total 6.05 |
|
0 |
86000 |
32250 |
0 |
32250 |
|
|
|
|
|
|
|
|
|
6.06 - Unités de production articles en
gypsecomposieten |
|
|
|
|
|
|
60601 |
6.06.01 Atelier - Unités de
production articles en gypsecomposieten
(2).Achats locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60602 |
6.06.02 Shovel/préparation dépôt
gypse.Achat local |
3 |
0 |
0 |
0 |
0 |
0 |
60603 |
6.06.03 Construction et
équipement usines (*15000 chaque usine - 2 usines.Achats locaux équipements
préférés. |
3 |
0 |
0 |
0 |
0 |
0 |
60604 |
6.06.04 Formes et moules pour
produit 2 usines.Voir 7.02.01 |
3 |
0 |
0 |
0 |
0 |
0 |
60605 |
6.06.05 Localisation dépôts
et contrôles qualité. Frais locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60606 |
6.06.06 Camion ou petit
tracteur pour shovel. Achat local préféré. |
3 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.06: Unités
de production articles en gypsecomposieten |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
6.07 Structures
recyclage assainissement |
|
|
|
|
|
|
60701 |
6.07.01 Atelier– Systèmes
recyclage. Petits achats locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60702 |
6.07.02 Établissement
réseau recyclage - assainissement. Voir 7.02.02 |
3 |
0 |
72000 |
27000 |
0 |
27000 |
60703 |
6.07.03 Établissement réseau
récolte compostage. Petits achats locaux.
Mois 13-24. |
3 |
10000 |
40000 |
15000 |
0 |
25000 |
60704 |
6.07.04 Récolte journalière
ordures organiques niveau réservoir |
2,3,4 |
0 |
160000 |
60000 |
0 |
60000 |
60705 |
6.07.05 Récolte ordures organiques
niveau 220 zones réservoir premiers 24 mois |
2,3,4 |
0 |
120000 |
45000 |
0 |
45000 |
60706 |
6.07.06 Récolte ordures
non-organiques niveau 46 forages premiers 24 mois |
2,3,4 |
0 |
160000 |
60000 |
0 |
60000 |
|
|
|
|
|
|
|
|
|
Sous-total 6.07
Structures recyclage assainissement |
|
10000 |
552000 |
207000 |
0 |
217000 |
|
|
|
|
|
|
|
|
|
6.08 Système bio-masse |
|
|
|
|
|
|
60801 |
6.08.01 Atelier- Système bio-masse.
(Assainissement – santé).Petits achats locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60802 |
6.08.02 Construction 46
unités de production de mini-briquettes pour foyers améliorés |
3 et 4 |
0 |
76.800 |
28800 |
0 |
28800 |
60803 |
6.08.03 Équipements (y comprises
presses) pour la production des mini-briquettes.Voir 7.02.21) |
3 et 4 |
0 |
0 |
0 |
0 |
0 |
60804 |
6.08.04 Production
mini-briquettes niveau forages premiers 24 mois. (320.000 heures.) |
3 et 4 |
0 |
0 |
0 |
0 |
0 |
60805 |
6.08.05 Production
bio-masse pour mini-briquettes niveau résservoir premiers 24 mois. (120.000
heures). |
3 et 4 |
0 |
0 |
0 |
0 |
0 |
60806 |
6.08.06 Production premiers
2000 foyers améliorés (sur 20.000 environ programmés). (assainissement –
santé) |
3 |
0 |
80000 |
30000 |
0 |
30000 |
|
|
|
0 |
|
|
|
|
|
Sous-total 6.08 8
Système bio-masse |
|
0 |
156800 |
58800 |
0 |
58800 |
|
|
|
|
|
|
|
|
|
6.09 Eau potable |
|
|
|
|
|
|
60901 |
6.09.01 OW - Structures eau
potable. Petits achats locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60902 |
6.09.02 Établissement
administration centrale des structures eau potable.Achats locaux. |
2 |
0 |
0 |
0 |
0 |
0 |
60903 |
6.09.03 Coût prévu forages 3000m
@ Euro 150.Voir sous-traitance 7.1 Travaux |
3 |
0 |
0 |
0 |
0 |
0 |
60904 |
6.09.04 32 points lavage |
3 |
2000 |
16000 |
6000 |
0 |
8000 |
60905 |
6.09.05 32 margelles pour
pompes manuelles (groupes triples) |
3 |
2000 |
16000 |
6000 |
0 |
8000 |
60906 |
6.09.06 Clôture et
structures 46 zones forage, accommodation gardiens. Achats locaux. |
3 |
15000 |
32000 |
12000 |
0 |
27000 |
60907 |
6.09.07 220 Pompes
solaires.Voir 7.02.03 |
3 |
0 |
0 |
0 |
0 |
0 |
60908 |
6.09.08 200 Supports panneaux.Faits
localement. Petits achats locaux. |
3 |
8000 |
20000 |
7500 |
0 |
15500 |
60909 |
6.09.09 Panneaux solaires
(220*300 W = 67 kW).Voir 7.02.04 |
3 |
0 |
0 |
0 |
0 |
0 |
60910 |
6.09.10 139 pompes
manuelles acier inoxydable.Voir 7.02.05 |
3 |
0 |
0 |
0 |
0 |
0 |
60911 |
6.09.11 Câbles, tuyaux pour
pompes/puits.Voir 7.02.06 |
3 |
0 |
0 |
0 |
0 |
0 |
60912 |
6.09.12 Tuyaux puits aux
réservoirs – 200000m @ Euro 0.5. Voir 7.02.07 |
3 |
0 |
0 |
0 |
0 |
0 |
60913 |
6.09.13 Travail pose
tuyaux (200.000m) |
3 |
0 |
64000 |
24000 |
0 |
24000 |
60914 |
6.09.14 220 Réservoirs eau
à 15m3 |
3 |
10000 |
64000 |
24000 |
0 |
34000 |
60915 |
6.09.15 220 Bases
réservoirs |
3 |
0 |
32000 |
12000 |
0 |
12000 |
60916 |
6.09.16 Supervision de l’installation/formation
des artisans pour entretien |
3 |
2600 |
9600 |
3600 |
0 |
6200 |
60917 |
6.09.17 Magasin pièces
détachées pompes.Voir 7.02.08 |
3 |
0 |
0 |
0 |
0 |
0 |
60918 |
6.09.18 Installation 220
réservoirs |
3 |
0 |
36000 |
13500 |
0 |
13500 |
60919 |
6.09.19 Entretien
installations eau premiers 24 mois |
3 et 4 |
0 |
12000 |
4500 |
0 |
4500 |
60920 |
6.09.20 36 Installations de
purification d’eau pour cliniques et écoles.Voir 7.02.09 |
4 |
0 |
2800 |
1050 |
0 |
1050 |
60921 |
6.09.21 Autres
installations purification d’eau (inc.15.000 Wc panneaux solaires) |
4 |
0 |
0 |
0 |
0 |
0 |
60922 |
6.09.22 Équipements de
contrôle de la qualité de l’eau.Voir 7.02.20 |
4 |
0 |
0 |
0 |
0 |
0 |
60923 |
6.09.23 Services monitorage
eau potable premiers 24 mois |
3 et 4 |
0 |
6400 |
2400 |
0 |
2400 |
60924 |
6.09.24 Frais transport
Europa-Rep. Nigérienne : la plupart de ces transports se réfèrent aux
structures en eau potable. Voir 7.03.04 |
3 |
0 |
0 |
0 |
0 |
0 |
60925 |
6.09.25 Frais transport
locaux : la plupart de ces transports se réfèrent aux structures en eau
potable. Voir 7.03.05 |
3 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.09
Structures en eau potable. |
|
39600 |
310800 |
116550 |
0 |
156150 |
|
|
|
|
|
|
|
|
|
6.10 Structures
éco-sanitaires |
|
|
|
|
|
|
61001 |
6.10.01 Construction premiers 1500 systèmes éco-san
(premiers 24 mois) |
3 et 4 |
0 |
60000 |
22500 |
0 |
22500 |
61002 |
6.10.02 Construction
bâtiments premiers 1500 systèmes éco-san (premiers 24 mois) |
3 et 4 |
0 |
60000 |
22500 |
0 |
22500 |
61003 |
6.10.03 Installation
premiers 1500 systèmes éco-san (premiers 24 mois) |
3 et 4 |
0 |
16000 |
6000 |
0 |
6000 |
61004 |
6.10.04 Monitorage
premières installations éco-san (premiers 24 mois) |
3 et 4 |
0 |
4000 |
1500 |
0 |
1500 |
61005 |
6.10.05 Construction et installation premiers 1500
réservoirs à compostage doméstiques (premiers 24 mois) |
3 et 4 |
0 |
6000 |
2250 |
0 |
2250 |
61006 |
6.10.06 Construction et installation premiers 1500
jardins verticaux doméstiques (premiers 24 mois) |
3 et 4 |
0 |
6000 |
2250 |
0 |
2250 |
|
|
|
|
|
|
|
|
|
Sous-total 6.10:
Structures éco-sanitaires |
|
0 |
152000 |
57000 |
0 |
57000 |
|
|
|
|
|
|
|
|
|
6.11 Salles études |
|
|
|
|
|
|
61101 |
6.11.01 Construction 220
salles études au niveau des commissions réservoir |
3 et 4 |
0 |
48000 |
18000 |
0 |
18000 |
61102 |
6.11.02 220 systemes
éclairage photovoltaïque pour les études. Voir 7.02.10 |
3 et 4 |
0 |
0 |
0 |
0 |
0 |
61103 |
6.11.03 Installation 220
systemes éclairage photovoltaïque pour les études |
3 et 4 |
0 |
3200 |
1200 |
0 |
1200 |
61104 |
6.11.04 Télévision
photovoltaïque pour les études. |
3 et 4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.11
Structures éco-sanitaires |
|
0 |
51200 |
19200 |
0 |
19200 |
|
|
|
|
|
|
|
|
|
6.12 Éclairage écoles et
cliniques |
|
|
|
|
|
|
61201 |
6.12.01Éclairage
photovoltaïque pour les +/-28 écoles eistantes. Voir 7.02.11 |
4 |
0 |
0 |
0 |
0 |
0 |
61202 |
6.12.02 Installation éclairage
photovoltaïque pour les +/-28 écoles existantes. |
4 |
0 |
800 |
300 |
0 |
300 |
61203 |
6.12.03 Éclairage
photovoltaïque/installation pour les cliniques dans la zone du projet. Voir
7.02.12 |
4 |
0 |
0 |
0 |
0 |
0 |
61204 |
6.12.04 Réfrigération
photovoltaïque/installation aux cliniques @ Euro 6000/clinique. Voir 7.02.13 |
4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.12
Éclairage écoles et cliniques |
|
0 |
800 |
300 |
0 |
300 |
|
|
|
|
|
|
|
|
|
6.13 Structures récolte
eau pluviale utilisation doméstique |
|
|
|
|
|
|
61301 |
6.13.01 Construction premiers 200 systèmes de
récolte eau pluviale doméstique |
4 |
0 |
36000 |
13500 |
0 |
13500 |
61302 |
6.13.02 Monitorage
premières installations récolte eau (premiers 24 mois) |
4 |
0 |
400 |
150 |
0 |
150 |
|
|
|
|
|
|
|
|
|
Sous-total 6.13
Structures récolte eau pluviale utilisation doméstique |
|
0 |
36400 |
13650 |
0 |
13650 |
|
|
|
|
|
|
|
|
|
6.14 Station radio |
|
|
|
|
|
|
61401 |
6.14.01 Atelier station
radio;ammeublement etc. |
4 |
0 |
0 |
0 |
0 |
0 |
61402 |
6.14.02 Fonds station
radio;achat équipements.Voir 7.02.14. |
4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.14 Station
radio |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
6.15 Fonds éclairage PV |
|
|
|
|
|
|
61501 |
6.15.01 Fonds éclairage photovoltaïque
ménages;déstinés achats premiers systèmes. Voir 7.02.15. |
4 et 5 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.15 Fonds
éclairage PV |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
6.16 Ambulances à bicyclette |
|
|
|
|
|
|
61601 |
6.16.01 46 Ambulances pour
bicyclettes. |
4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.16
Ambulances à bicyclette |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
6.17 Centres meuniers |
|
|
|
|
|
|
61701 |
6.17.1 46 Centres meuniers. Voir aussi 7.02.22 |
4 |
0 |
2400 |
900 |
0 |
900 |
|
|
|
|
|
|
|
|
|
Sous-total 6.17 Centres
meuniers |
|
0 |
2400 |
900 |
0 |
900 |
|
|
|
|
|
|
|
|
|
6.18 Centres medicaments |
|
|
|
|
|
|
61801 |
6.18.1 46 Centres
distribution médicaments. Voir aussi 7.02.23 |
4 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 6.18 Centres
médicaments. |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
6.19 Centres stockage
aliments |
|
|
|
|
|
|
61901 |
6.19.1 46 Centres stockage
aliments. |
4 |
950 |
24800 |
9300 |
0 |
10250 |
|
|
|
|
|
|
|
|
|
Sous-total 6.19 Centres
stockage aliments. |
|
950 |
24800 |
9300 |
0 |
10250 |
|
|
|
|
|
|
|
|
62001 |
Centres infermiers |
|
|
|
|
|
|
62101 |
Centres médicins |
|
|
|
|
|
|
62201 |
Construction écoles
primaires |
|
|
|
|
|
|
62301 |
Construction écoles
intermédiaires |
|
|
|
|
|
|
62401 |
École artisanat |
|
|
2047200 |
|
|
|
|
|
|
|
|
|
|
|
|
6. SOUS-TOTAL AUTRE |
|
50550 |
2047200 |
767700 |
0 |
818250 |
|
|
|
|
|
|
|
|
|
7. Sous-traitance
rélative aux activités de construction |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
7.01 Travaux |
|
|
|
|
|
|
70101 |
7.01.01 Construction 46
forages à diam. int. |
3 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 7.01Travaux |
|
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
7.02 Fournitures |
|
|
|
|
|
|
70201 |
7.02.01 Formes et moules
pour produits 2 usines. Voir 6.06.04 |
2 et 3 |
15000 |
0 |
0 |
0 |
15000 |
70202 |
7.02.02 Établissement
réseau recyclage-assainissement. Moyens transport.Voir 6.07.02 |
3 |
82000 |
0 |
0 |
0 |
82000 |
70203 |
6.09.07 200 Pompes solaires
compris boïtiers électroniques Voir 6.09.07 |
3 |
150000 |
0 |
0 |
0 |
150000 |
70204 |
7.02.04 Panneaux solaires
(220*300 W = 67 kW)Voir 6.09.09 |
3 |
175000 |
0 |
0 |
0 |
175000 |
70205 |
7.02.05 139 pompes
manuelles entièrement en acier inoxydableVoir 6.09.10 |
3 |
0 |
0 |
0 |
0 |
0 |
70206 |
7.02.06 Câbles, tuyaux
accessoires pour pompes/puits Voir 6.09.11 |
3 |
0 |
0 |
0 |
0 |
0 |
70207 |
7.02.07 Tuyaux puits aux
réservoirs – 200000m @ Euro 0.75. Voir 6.09.12 |
3 |
75000 |
0 |
0 |
0 |
75000 |
70208 |
7.02.08 Magasin pièces détachées
pompes Voir 6.09.17 |
3 |
20000 |
0 |
0 |
0 |
20000 |
70209 |
7.02.09 37 Installations de
purification d’eau pour cliniques et écoles (back-up)Voir 6.09.20 |
4 |
49300 |
0 |
0 |
0 |
49300 |
70210 |
7.02.10 220 systemes éclairage
photovoltaïque pour les études.Voir 6.11.02 |
3 |
0 |
0 |
0 |
0 |
0 |
70211 |
7.02.11 Éclairage
photovoltaïque pour les +/-30 écoles existantes.Voir 6.12.01 |
4 |
60000 |
0 |
0 |
0 |
60000 |
70212 |
7.02.12 Éclairage photovoltaïque/installation
pour les cliniques dans la zone du projet. Voir 6.12.03 |
4 |
12000 |
0 |
0 |
0 |
12000 |
70213 |
7.02.13 Réfrigération
photovoltaïque/installation aux cliniques @ Euro 6000/clinique.Voir 6.12.04 |
4 |
12000 |
0 |
0 |
0 |
12000 |
70214 |
7.02.14 Fonds station
radio;achat équipements.Voir 6.14.02 Pro-memorium (exclu du projet) |
4 |
0 |
0 |
0 |
0 |
0 |
70215 |
7.02.15 Fonds éclairage
photovoltaïque ménages; déstinés achats premiers systèmes. Voir 6.15.01. |
4 et 5 |
10000 |
0 |
0 |
0 |
10000 |
70216 |
7.02.16 Bureaux et mobilier
46 systèmes SEL-LETS.Achats locaux.Voir 6.04.02 |
2 |
0 |
0 |
0 |
0 |
0 |
70217 |
7.02.017 Ordinateur
principal systèmes SEL-LETS et back-up.Voir 6.04.03 |
2 |
0 |
0 |
0 |
0 |
0 |
70218 |
7.02.18 100 ordinateurs
régistration transactions SEL-LETS (100 transactions/personne/heure). Voir 6.04.04 |
2 |
0 |
0 |
0 |
0 |
0 |
70219 |
7.02.19 Alimentation PV 92
systèmes SEL-LETS et accessoires.Voir 6.04.05 |
2 |
0 |
0 |
0 |
0 |
0 |
70220 |
7.02.20 Équipements de
contrôle de la qualité de l’eau.Voir 6.09.22 |
4 |
7500 |
0 |
0 |
0 |
7500 |
70221 |
7.02.21 Équipements (y
comprises presses) pour la production des mini-briquettes.Voir 6.08.03)32 @
Euro 2.500 |
3 et 4 |
80000 |
0 |
0 |
0 |
80000 |
70222 |
7.02.22 Achat 46 moulins à
grain . Voir 6.17.01 |
3 |
0 |
0 |
0 |
0 |
0 |
70223 |
7.02.23 Éclairage PV 46
points de distribution médicaments. Voir 6.18.01 |
3 |
0 |
0 |
0 |
0 |
0 |
|
|
|
|
|
|
|
|
|
Sous-total 7.02 Fournitures |
|
747800 |
0 |
0 |
0 |
747800 |
|
|
|
|
|
|
|
|
|
7.03 Services |
|
|
|
|
|
|
70301 |
7.03.01 Sub-contractor
consultant projets intégrés (niveau pro-diem) 24 mois Voir 1.02.01.01 |
2,3,4 |
66065 |
0 |
0 |
0 |
66065 |
70302 |
7.03.01 Sub-contractor
consultant cours hygiène 6 mois @ Euro 4.167, voir 1.02.01.02 |
2. |
0 |
0 |
0 |
0 |
0 |
70303 |
7.03.02 Sub-contractor
consultant workshops organisationnels.12 mois @ Euro 4.167.voir 1.02.01.03 |
2 et 3 |
0 |
0 |
0 |
0 |
0 |
70304 |
7.03.04 Frais transport
Europa-Rep. Nigérienne : la plupart de ces transports se réfèrent aux
structures en eau potable.Voir 6.09.24 |
3 |
45000 |
0 |
0 |
0 |
45000 |
70305 |
7.03.05 Frais transport locaux
: la plupart de ces transports se réfèrent aux structures en eau potable.
Voir 6.09.25 |
3 |
40000 |
0 |
0 |
0 |
40000 |
70306 |
7.03.06 Sub-contractant
consultant produits en composites de gypse; atelier organisationnel; mise en place
usines 12 mois @ Euro 4.167 voir 1.02.01.04 |
2 et 3 |
33065 |
0 |
0 |
0 |
33065 |
|
|
|
|
|
|
|
|
|
Sous-total 7.03 Services |
|
184130 |
0 |
0 |
0 |
184130 |
|
|
|
|
|
|
|
|
|
7. SOUS-TOTAL SOUS-TRAITANCE
RELATIVE AUX ACTIVITÉS DE CRÉATION DES STRUCTURES |
|
931930 |
0 |
0 |
0 |
931930 |
|
|
|
|
|
|
|
|
|
8. Sous-total des coûts
directs éligibles de l’action (1-7) |
|
1140395 |
2075133 |
778175 |
0 |
1918570 |
|
9. Imprévus (max. 5% de
8) soit 2,87% environ du
total dont au point 8. |
|
55125 |
0 |
0 |
0 |
55125 |
|
10. Total des coûts
directs éligibles de l’action (8+9) |
|
1195520 |
0 |
778175 |
0 |
1973695 |
|
11. Coûts administratifs
(maximum 7% de 10) soit 1,22% environ du total des coûts directs éligibles de
l’action au point 10.) |
|
24000 |
0 |
0 |
0 |
24000 |
|
12. Total des coûts
éligibles de l’action (10+11) |
|
1219520 |
0 |
778175 |
0 |
1997695 |
|
13. Contribution en
nature. |
|
|
|
|
|
|
Back :
07.01 Documents necessary for the
drafting of applicaions for seed finance.
Next:
07.10 The budget in standard form.