NGO Another Way (Stichting Bakens Verzet), 1018 AM Amsterdam, Netherlands.

 

                                                                                    01. E-course : Diploma in Integrated Development (Dip. Int. Dev)

 

Edition 01: 30 November, 2009

 

Tekstvak:         Quarter 2.

 

 

 

Tekstvak: SECTION B : SOLUTIONS TO THE  PROBLEMS.

 

 

 

Study points : 06 points out of 18.

Minimum study time : 186 hours out of 504

 

The points are awarded only on passing the consolidated exam for  Section B :  Solutions to the Problems.

 


 

Fifth block : How the third block structures solve specific problems.

 

Study points : 02 points out of 18

Minimum study time : 54 hours out of 504

 

The points are awarded only on passing the consolidated exam for  Section B :  Solutions to the Problems.

 


 

Fifth block : How the third block structures solve specific problems.


 

Section 7: Water and sanitation. [5 hours]

 

02.00 Hours Water.

02.00 Hours Sanitation.

01.00 Report.

 


 

Section 7: Water and sanitation. [5 hours]

 

Preparation report. (At least 1 hour)

 

Prepare your report on the basis of the work you have done during your study for Section 7 of Block 5. In practice, you have already prepared the documentation for your report. You are obviously free to adapt your texts to create a harmonious and interesting document.

 

Comments setting up a direct relation between your project area and the study material will be privileged.

 

Your report is based on 30 points, being 10 points for each of the sections  02-03, and 10 points for your conclusion. The resulting figure is divided by 3, to produce a final mark out of 10. A final mark of at least  7 out of 10 is required. If your result is less than 7 out of 10 or in case of a very weak result in any specific aspect, your tutor will inform you of the weaknesses so that you review the subjects in question.

 

The study points earned for your work on Block 5 will not be awarded until you pass the consolidated exam for Section B  You can sit the Section B exam after passing the Block 5 exam.

 

Be brief. You are required to respect the maximum number of words. Anything written in excess of that number will be considered as not written.

 

The title of your report is “Water and sanitation in  Integrated Development Projects”.

 

Here is the plan of your report :

 

Section 01 :  Short, coherent, introduction:  (Maximum 500 words. No points.)

Section 02 :  Water.  Maximum 500 words. 10 points.)

Section 03 :  Sanitation.  (Maximum 500 words. 10 points.)

Section 04 :  Your conclusion. (Maximum 500 words. 10 points.)

 

Transmit your report to your tutor.

 

 



 Fifth block :  Section 7: Water and sanitation. 

 Fifth block :  How fourth block structures solve specific problems.


Main index for the Diploma in Integrated Development (Dip.Int.Dev.)

 List of key words.

 List of references.

  Course chart.

 Technical aspects.


 Courses available.

Bakens Verzet Homepage.

 


"Money is not the key that opens the gates of the market but the bolt that bars them."

Gesell, Silvio, The Natural Economic Order, revised English edition, Peter Owen, London 1958, page 228.

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 

Creative Commons License

 

This work is licensed under a Creative Commons Attribution-Non-commercial-Share Alike 3.0 Licence

 

NGO "ANOTHER WAY" (STICHTING BAKENS VERZET), NETHERLANDS, SUSTAINABLE INTEGRATED SELF-FINANCING DEVELOPMENT PROJECTS AND ADVANCED DEVELOPMENT TECHNOLOGIES

NGO Another Way (Stichting Bakens Verzet), 1018 AM Amsterdam, Netherlands.

 

                                                                                    01. E-course : Diploma in Integrated Development (Dip. Int. Dev)

 

Edition 01: 30 November, 2009

 

Tekstvak:         Quarter 2.

 

 

 

Tekstvak: SECTION B : SOLUTIONS TO THE  PROBLEMS.

 

 

 

Study points : 06 points out of 18.

Minimum study time : 186 hours out of 504

 

The points are awarded only on passing the consolidated exam for  Section B :  Solutions to the Problems.

 


 

Fifth block : How the third block structures solve specific problems.

 

Study points : 02 points out of 18

Minimum study time : 54 hours out of 504

 

The points are awarded only on passing the consolidated exam for  Section B :  Solutions to the Problems.

 


 

Fifth block : How the third block structures solve specific problems.


 

Section 7: Water and sanitation. [5 hours]

 

02.00 Hours Water.

02.00 Hours Sanitation.

01.00 Report.

 


 

Section 7: Water and sanitation. [5 hours]

 

Preparation report. (At least 1 hour)

 

Prepare your report on the basis of the work you have done during your study for Section 7 of Block 5. In practice, you have already prepared the documentation for your report. You are obviously free to adapt your texts to create a harmonious and interesting document.

 

Comments setting up a direct relation between your project area and the study material will be privileged.

 

Your report is based on 30 points, being 10 points for each of the sections  02-03, and 10 points for your conclusion. The resulting figure is divided by 3, to produce a final mark out of 10. A final mark of at least  7 out of 10 is required. If your result is less than 7 out of 10 or in case of a very weak result in any specific aspect, your tutor will inform you of the weaknesses so that you review the subjects in question.

 

The study points earned for your work on Block 5 will not be awarded until you pass the consolidated exam for Section B  You can sit the Section B exam after passing the Block 5 exam.

 

Be brief. You are required to respect the maximum number of words. Anything written in excess of that number will be considered as not written.

 

The title of your report is “Water and sanitation in  Integrated Development Projects”.

 

Here is the plan of your report :

 

Section 01 :  Short, coherent, introduction:  (Maximum 500 words. No points.)

Section 02 :  Water.  Maximum 500 words. 10 points.)

Section 03 :  Sanitation.  (Maximum 500 words. 10 points.)

Section 04 :  Your conclusion. (Maximum 500 words. 10 points.)

 

Transmit your report to your tutor.

 

 



 Fifth block :  Section 7: Water and sanitation. 

 Fifth block :  How fourth block structures solve specific problems.


Main index for the Diploma in Integrated Development (Dip.Int.Dev.)

 List of key words.

 List of references.

  Course chart.

 Technical aspects.


 Courses available.

Bakens Verzet Homepage.

 


"Money is not the key that opens the gates of the market but the bolt that bars them."

Gesell, Silvio, The Natural Economic Order, revised English edition, Peter Owen, London 1958, page 228.

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 

Creative Commons License

 

This work is licensed under a Creative Commons Attribution-Non-commercial-Share Alike 3.0 Licence