KIOGORO  INTEGRATED SELF-FINANCING RURAL DEVELOPMENT PROJECT

 

KIOGORO DIVISION IN KISII CENTRAL DISTRICT IN THE REPUBLIC OF  KENYA

INCORPORATING LETS AND COMMUNITY BANKING

 

 

(partnership applications invited)

 

and

NGO STICHTING BAKENS VERZET, WIERINGERWERF, NETHERLANDS


"Money is not the key that opens the gates of the market but the bolt that bars them"

 

Gesell, Silvio The Natural Economic Order

Revised English edition, Peter Owen, London 1958, page 228

 

 

“Poverty is created scarcity”

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.


 (Edition 02 : 10th July, 2008)


06.00 THE PHASES OF PROJECT EXECUTION

 

06.29 Structure for the radio station

 

The establishment of a local radio station is an integral part of the project. The station is a part of the management of communications cncerning the project. Since most people in the project areas possess a radio, radio is an excellent way to spread information on the project developments and the management of the structures set up. It also enables users to discuss initiatives taken and to be taken, and to express their criticisms. It can also become a vehicle for local commerce.

 

The station will usually be placed in a location in the centre of the project area so as to limit the transmission radius. A PV operated station may be preferred to one running on "imported" electricity, as this increases the autonomy of the station and reduces long term financial leakage from the project area.

 

The management of the station will be completely autonomous.

 

Without influencing this independence in any way, the programme could indicatively coprise the following elements:

 

(a) Transmission of information on project activities (news bulletins)
- Convocation of meetings for structures (tanks commissions, LETS systems etc)
- Information on decisions taken during meetings
- Information on progress made with the installation/setting up of the various structures
- Information of interest-free mcro-credits conceded

 

(b) Transmissions by interest groups
- Initiatives the groups wish to take
- Information on itiatives under way

 

(c) Information on cultural and sporting activities in the project area

 

(d) Emergency services

 

(e) Promotion of the project towards the outside.

 

FINANCING

 

The setting up of the station is covered by a separate item in the indicative balance sheet. How can the station reimburse this interest-free credit?

 

- Work is carried out under the local LETS money systems - Expenses in formal currency (electricity?, equipment and the costs of running it) would need to be paid back over 3 or 4 years. How:
-a) Collection of a small (formal currency) contribution at household level?
-b) Payments for services rendered to people living in the areas surrounding the project area
- c) Advertising by producers in the project area towards people living in the surrounding areas Usually just one Moraisian workshop will be held in a given project area.

 

Capacitation workshop for the radio station:

 

Indicative participation

 

The Moraisian trainers
A member of the project coordination team
General Consultant
At least one representative of the ONG Project New Horizons for Kiogoro
Representative of the Ministry of Communications

At least 5 observers (possible coordinators for future projects)

20 persons indicated by the tank commissions interested in participating in the management of the station.
50 persons indicated by the tank commissions, interested in producing programmes for the station

 

Duration of the workshop: about three weeks.

 

The Workshop will be expected to produce the following structures:

 

a) A coordination structure
- definition of the social form
- statutes
- rules
- professional and administrative structures
- financial aspects including payments
- relations with the local money LETS systems

 

b) Analysis of requirements
- detailed analysis of the communications needs of the individual structures created under the project
- demand in the project area
- demand outside the project area

 

c) Material structure
- Land
- Permits
- Office/studio
- Transmission equipment
- Equipment for production and storing of programmes

 

d) Logistics
- Transport
- Storage of materials
- Organisation of network

 