Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
and
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English edition,
Peter Owen,
“Poverty is created scarcity”
Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th
annual NGO Conference, United Nations,
The distributed drinking water supply structures are the
structures which need the largest formal money capital investments. They will
defined by the people themselves during
a capacitation workshop following the formation of most of the other structures
planned. The following general indications are therefore subject to changes,
some of them important, from one project application to another. The following information should, however,
give a fair idea of the size and nature of
project applications.
See drawings:
PROJECT STRUCTURES
TANK COMMISSIONS – THE KEY STRUCTURES
WELL COMMISSIONS
DRAWING OF DRINKING WATER SUPPLY STRUCTURES
DRAWING OF A DRINKING WATER TANK INSTALLATION AREA
DRAWING OF COMPLETE WASTE RECYCLING STRUCTURE
List of villages and drinking water supply
requirements
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
Sublocations |
Inhabitants |
m3/day |
New wells boreholes |
Existing wells and boreholes to be upgraded |
Solar pumps |
Hand pumps |
PV panels Watts installed |
Schools Clinics Markets Pumps |
PV panels Watts installed |
01.0 Nyaguta |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1600 |
40 |
1 |
0 |
7 |
3 |
2100 |
1 |
300 |
|
2194 |
60 |
2 |
0 |
10 |
6 |
3000 |
2 |
600 |
|
1455 |
40 |
1 |
0 |
6 |
3 |
1800 |
2 |
600 |
|
|
(5249) |
(140) |
(4) |
(0) |
(23) |
(12) |
(6900) |
(5) |
(1500) |
02.0 Matunwa |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1100 |
35 |
1 |
0 |
5 |
3 |
1500 |
2 |
600 |
|
1081 |
30 |
1 |
0 |
4 |
3 |
1200 |
0 |
0 |
|
|
(2181) |
(65) |
(2) |
(0) |
(9) |
(6) |
(2700) |
(2) |
(600) |
03.0 Boronyi |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2700 |
70 |
2 |
0 |
10 |
6 |
3000 |
2 |
600 |
|
1350 |
35 |
1 |
0 |
6 |
3 |
1800 |
1 |
300 |
|
1409 |
40 |
1 |
0 |
5 |
3 |
1500 |
3 |
900 |
|
|
(5459) |
(145) |
(4) |
(0) |
(21) |
(12) |
(6300) |
(6) |
(1800) |
04.0 Masongo |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2500 |
65 |
2 |
0 |
11 |
6 |
3300 |
1 |
300 |
|
874 |
25 |
1 |
0 |
4 |
3 |
1200 |
4 |
1200 |
|
2100 |
55 |
1 |
0 |
8 |
3 |
2400 |
0 |
0 |
|
1812 |
50 |
1 |
0 |
7 |
3 |
2100 |
1 |
300 |
|
1200 |
35 |
1 |
0 |
5 |
3 |
1500 |
1 |
300 |
|
1100 |
30 |
1 |
0 |
4 |
3 |
1200 |
2 |
600 |
|
|
(9586) |
(260) |
(7) |
(0) |
(39) |
(21) |
(11700) |
(9) |
(2700) |
05.0 Kegati |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
917 |
30 |
1 |
0 |
3 |
3 |
900 |
2 |
600 |
|
2000 |
55 |
2 |
0 |
8 |
6 |
2400 |
2 |
600 |
|
860 |
25 |
1 |
0 |
3 |
3 |
900 |
0 |
0 |
|
1350 |
40 |
1 |
0 |
5 |
3 |
1500 |
2 |
600 |
|
900 |
25 |
1 |
0 |
3 |
3 |
900 |
0 |
0 |
|
|
(6027) |
(175) |
(6) |
(0) |
(22) |
(18) |
(6600) |
(6) |
(1800) |
06.0 Nyamemiso |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
820 |
30 |
1 |
0 |
2 |
3 |
600 |
3 |
900 |
|
1800 |
45 |
2 |
0 |
6 |
6 |
1800 |
0 |
0 |
|
1200 |
35 |
1 |
0 |
5 |
3 |
1500 |
1 |
300 |
|
|
(3820) |
(110) |
(4) |
(0) |
(13) |
(12) |
(3900) |
(4) |
(1200) |
07.0 Nyanguru |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3000 |
85 |
2 |
0 |
12 |
6 |
3600 |
2 |
600 |
|
1116 |
30 |
1 |
0 |
4 |
3 |
1200 |
2 |
600 |
|
1200 |
30 |
1 |
0 |
4 |
3 |
1200 |
0 |
0 |
|
2700 |
75 |
2 |
0 |
10 |
6 |
3000 |
4 |
1200 |
|
|
(8016) |
(220) |
(6) |
(0) |
(30) |
(18) |
(9000) |
(8) |
(2400) |
08.0 Bobaracho |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
489 |
15 |
1 |
0 |
2 |
1 |
600 |
0 |
0 |
|
3000 |
80 |
2 |
0 |
12 |
6 |
3600 |
2 |
600 |
|
2000 |
50 |
1 |
0 |
8 |
3 |
2400 |
0 |
0 |
|
1513 |
50 |
2 |
0 |
4 |
6 |
1200 |
6 |
1800 |
|
670 |
20 |
1 |
0 |
2 |
3 |
600 |
0 |
0 |
|
|
(7672) |
(215) |
(7) |
(0) |
(28) |
(19) |
(8400) |
(8) |
(2400) |
09.0 Nyaura |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1716 |
50 |
2 |
0 |
7 |
6 |
2100 |
7 |
2100 |
|
2120 |
55 |
2 |
0 |
8 |
6 |
2400 |
2 |
600 |
|
870 |
25 |
1 |
0 |
3 |
3 |
900 |
1 |
300 |
|
450 |
15 |
1 |
0 |
2 |
3 |
600 |
1 |
300 |
|
1650 |
45 |
1 |
0 |
7 |
3 |
2100 |
0 |
0 |
|
3000 |
80 |
2 |
0 |
11 |
6 |
3300 |
1 |
300 |
|
2500 |
65 |
2 |
0 |
8 |
6 |
2400 |
2 |
600 |
|
520 |
15 |
1 |
0 |
2 |
3 |
600 |
0 |
0 |
|
867 |
25 |
1 |
0 |
3 |
3 |
900 |
0 |
0 |
|
|
(13693) |
(375) |
(13) |
(0) |
(51) |
(39) |
(15300) |
(14) |
(4200) |
10.0 Nyanchwa |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3000 |
85 |
2 |
0 |
10 |
6 |
3000 |
4 |
1200 |
|
920 |
25 |
1 |
0 |
4 |
3 |
1200 |
0 |
0 |
|
2299 |
60 |
2 |
0 |
10 |
6 |
3000 |
0 |
0 |
|
1450 |
40 |
1 |
0 |
5 |
3 |
1500 |
1 |
300 |
|
|
(7669) |
(210) |
(6) |
(0) |
(29) |
(18) |
(8700) |
(5) |
(1500) |
11.0 Township |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
1402 |
40 |
1 |
0 |
6 |
3 |
1800 |
0 |
0 |
|
680 |
20 |
1 |
0 |
2 |
3 |
600 |
1 |
300 |
|
1320 |
35 |
1 |
0 |
5 |
5 |
1500 |
0 |
0 |
|
2800 |
70 |
2 |
0 |
12 |
6 |
3600 |
0 |
0 |
|
1880 |
50 |
1 |
0 |
6 |
3 |
1800 |
2 |
600 |
|
318 |
10 |
1 |
0 |
1 |
3 |
300 |
1 |
300 |
|
|
(8400) |
(225) |
(7) |
(0) |
(32) |
(23) |
(9600) |
(4) |
(1200) |
|
|
|
|
|
|
|
|
|
|
Totals |
77772 |
2140 |
66 |
0 |
297 |
198 |
89100 |
71 |
21300 |
|
|
|
|
|
|
|
|
|
|
Summary:
Basic information for drinking water supply :
Inhabitants : 77772 (presumed 80.000)
Boreholes : 66
Approximately litres/day 2.140.000 (
Solar pumps installed : 368
Installed photovoltaic power : 110.4 KW
15 m3 water tanks :368
Back-up hand pumps : 198 being 66 triple sets.
Pipelines from boreholes to water tanks
(estimation) : 200000m.
For more information refer to:
Principles applied for placing drinking water
structures
Boreholes and wells and their equipment
Water points near family homes
Some budget items applicable to
the water supply structures
Capacitation
workshop for the creation of the drinking water supply structures
For possible technical solutions for the
drinking water distribution system refer to:
DRAWING OF WATER
SYSTEM STRUCTURES.
DRAWING OF TYPICAL WATER TANK AREA.
One Moraisian workshop will be held.
Indicative participation
The Moraisian trainers
A member of the project coordination team
General Consultant
Gypsum composites consultant
At least one representative of the NGO Project New Horizons for Kiogoro
Representative of the Health Ministry
Representative of the Rural Development ministry
At least 5 observers (possible coordinators for future projects)
66 persons indicated by the well commissions interested in the systematic
maintenance of the structures
297 persons indicated by the tank commissions, interested in drilling boreholes,
drilling wells and building the associated civil and associated works
Duration of the workshop: about four weeks.
The Workshop will be expected to produce the
following structures:
a) A coordination structure
- definition of the social form
- statutes
- rules
- professional and administrative structures
- financial aspects including payments
- relations with the local money LETS systems
b) Analysis of requirements
c) Hydro-geological research
d) Preparation of maps showing:
- sites of boreholes and wells
- tank sites
- feed-pipe installation lines
e) Specifications
- Work bases/depots
- Boreholes/wells
- Solar pumps
- Hand pumps
- Washing areas
- Solar panels
- Panel supports
- Borehole/well surroundings
- Laying of pipelines
- Installation tanks
- Eventual installation of UV purification units
- Training of well commissions
- Training of tank commission
f) Permits
g) The civil works
- Base for storage of equipment and materials
- Formation of teams
- Planning of works
- Logistics
- Equipment and materials
h) Installation of the structures
i) Maintenance
- Creation of the maintenance structure
- Relations with suppliers
- Importation and management of spare parts
- Planning of preventive maintenance
- Maintenance kits
- Monitoring system
- System of statistics
f) Logistics
- Assembly and stocking of materials
- distribution of mini-briquettes
g) Organisation of the cultivation of bio-mass
h) Commercial
- Availability of micro-credits for growers
- Availability of micro-credits for briquette makers
- Prices for briquette distribution according to the various mixtures
Next file :
06.40 Third phase of project execution.
Back to:
06.29 Creation of the structure for the local radio
station.