Director,
T.E.(Terry)
Manning,
Schoener 50,
1771 ED
Wieringerwerf,
The
Tel:
0031-227-604128
Homepage:
http://www.flowman.nl
E-mail:
(nameatendofline)@xs4all.nl : bakensverzet
Incorporating
innovative social, financial, economic, local administrative and productive
structures, numerous renewable energy applications, with an important role for
women in poverty alleviation in rural and poor urban environments.
"Money is not
the key that opens the gates of the market but the bolt that bars them"
Gesell, Silvio The
Natural Economic Order
Revised English
edition, Peter Owen, London 1958, page 228
Edition 9:
Axis rods |
Reassembly 21,22; removal 20 |
Bleeder nipple |
|
Booster |
Operation pages 26-27;Maintenance Pages 28 through 38 |
Brushes motor |
Access04;maintenance
05 |
Cam connector |
Dismantling06,07 |
Cam shaft |
|
Controllers |
Operation pages 26-27 Maintenance pages 28 through 38 |
Body "O" ring |
Reassembly 08; seating 09; warning 08 |
Drawing of pump |
Drawing 25 |
Electric cable |
Check11; weld
joint 11; connections motor 12; warning 9, warning14 |
Filter |
Reassembly 09 ; removal 04 |
Foot valve rubber |
Access 14;replacement
14 |
Hyboost |
|
Motor |
|
Motor base ring |
Reassembly 08 |
Nipple (bleeder) |
Cleaning 13 |
Oil |
Notes on 24, opening pump 18; warning 04,warning06,07, warning 09,warning 18,19 |
Oil seal |
Acess 23, replacement
23 |
Opening pump |
Opening pump 03 |
Ovoid |
|
Ovoid chamber |
On opening 03,04; re-fitting 13 |
Piston bearings |
Access 19, replacement 20; reassembly 20,21,22 |
Piston gaskets |
Check 19 |
Piston guides |
Check 19 |
Piston "O" rings |
Check 19 |
Pistons |
Access 18, check19, reassembly
20,21,22 |
Pump assembly |
Drawing 18; opening 18; reassembly 19b |
Pump body |
Check 23 |
Pump body rings |
Check 23 |
Rapid couplings |
Removal 13; reassembly 08,09 |
Safety cord |
Check 10 |
Seal |
Opening seal 03, re-sealing 10 |
Seal ring for body |
Reassembly 07 ; removal 04 |
Shaft bearing |
Access 23; substitution 23 |
Springs |
|
Stator |
Magnets 39 |
Terminals pump |
Check 05 |
Tie-rod U strap |
Release 03; reassembly 09,10 |
Valve chamber |
|
Valve rubbers |
Access 15; reassembly 16; replacement;Drawing
16 |
Valve spindle nut |
Removal 16; reassembly;Drawing
17 |
Washers tie-rod |
Reassembly 10 |
Wiggle wire |
Bleeder cleaning 03,cleaning 13 |
Menu for the maintenance of Solar Spring pumps.
Some recommended technologies,
List of attachments to the Model.
Typical list of graphs and
drawings.
List of abbreviations used.
List of key words.
Documents for funding
applications.