NGO Another Way (Stichting Bakens Verzet), 1018 AM Amsterdam, Netherlands.

 

Direction : Schoener 50, 1771 ED Wieringerwerf, Netherlands

Tel. 0031-227-604128 ; e-mail : bakensverzet@xs4all.nl; website : www.integrateddevelopment.org

 

SELF-FINANCING, ECOLOGICAL, SUSTAINABLE, LOCAL INTEGRATED DEVELOPMENT PROJECTS FOR THE WORLD’S POOR

 

01. E-course : Diploma in Integrated Development (Dip. Int. Dev. )

 

Edition 01: 31 December, 2009.

Edition 05: 14  March, 2013.

 

(Francais.)

 

List of  key words in alphabetical order

 

 

Key Word

Block

Section

Part

Maintenance on-going costs

Fourth block : the structures to be created.

Section 4: Productive structures.

4. Installation and maintenance cooperatives.

Maintenance on-going costs

Fifth block : How fourth block structures solve specific problems.

Section 3: Credit crisis.

In-depth analysis.

Maintenance on-going costs

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

05. Management costs.

Maintenance structures

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Maintenance water supply structures

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

04. In depth - drinking water.

Malaria

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

06. Combat HIV/aids, malaria and other diseases.

Malaria

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Malnutritiion

Fourth block : the structures to be created.

Section 5: Services structures.

10. Health structures.

Management cooperative

Third block : Solutions to the problems.

 

Section 2 : Division of des responsibilities amongst the three levels of structures.

06. Permanent cooperative for the management of the project structures.  

Management cooperative

Fifth bock : How fourth block structures solve specific problems.

Section 5: Sustainability.

Analysis of Model material. 

Management costs

Fifth bock : How fourth block structures solve specific problems.

Section 3: Credit crisis.

In-depth analysis.

Management costs

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

01. Introduction.

Management costs

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

05. Management costs.

Management lines

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

05. Management lines for individual projects. 

Management structures

Third block : Solutions to the problems.

 

Section 2 : Division of des responsibilities amongst the three levels of structures.

05. Central committee. 

Management structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

01. The Permanent Cooperative of the Management of the Project Structures.

Management structures central committee level

Eighth block : Economic aspects.

Section 2 : Management of the structures.

04. Central committee level.

Management structures formation

Third block : Solutions to the problems.

 

Section 2 : Division of des responsibilities amongst the three levels of structures.

06. Permanent cooperative for the management of the project structures.  

Management structures project management level

Eighth block : Economic aspects.

Section 2 : Management of the structures.

05. The project management.

Management structures tank commission level

Eighth block : Economic aspects.

Section 2 : Management of the structures.

02. Tank commission level.

Management structures well-commission level

Eighth block : Economic aspects.

Section 2 : Management of the structures.

03. Well commission level.

Marketing

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Maternal health

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

05. Improve maternal health.

Maternal health

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

05. Improve maternal health.

Maternal Health Millennium Goal 5

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Means of transfer

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Financial leakage : interest and subsidies.

Medical practices size

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

02. Second level : groups of clans with chief. 

Medical services

Fourth block : the structures to be created.

Section 5: Services structures.

10. Health structures.

Medicines and aid

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

10. In depth : the industry of poverty.

Metals recycling

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Methane recovery

Fourth block : the structures to be created.

Section 5: Services structures.

05. Waste recycling structures : organisation.

Micro-credit fund

Fourth block : the structures to be created.

Section 3: Financial structures.

5. The interest-free micro-credit systems  - introduction.

Micro-credit fund recycling

Fourth block : the structures to be created.

Section 3: Financial structures.

6. The interest-free micro-credit systems  - more details.

Micro-credit fund in emergencies

Fourth block : the structures to be created.

Section 3: Financial structures.

5. The interest-free micro-credit systems  - introduction.

Micro-credit loans cycle

Fourth block : the structures to be created.

Section 3: Financial structures.

5. The interest-free micro-credit systems  - introduction.

Micro-credit structures costs

Fourth block : the structures to be created.

Section 3: Financial structures.

6. The interest-free micro-credit systems  - more details.

Micro-credit structures interest-free

Fourth block : the structures to be created.

Section 3: Financial structures.

5. The interest-free micro-credit systems  - introduction.

Micro-credit structures interest-free

Fourth block : the structures to be created.

Section 3: Financial structures.

6. The interest-free micro-credit systems  - more details.

Micro-credit systems creation

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

4. The second phase of execution.

Millennium Goal 1 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Millennium Goal 1 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

01. Eradicate extreme poverty and hunger.

Millennium Goal 2

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

07. In depth : Financial leakage : health and education.

Millennium goal 2

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

11. In depth -  education for all.

Millennium Goal 2 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Millennium goal 2 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

02. Achieve universal primary education.

Millennium goal 2 education

Fourth block : the structures to be created.

Section 5: Services structures.

09. Education structures.

Millennium Goal 3

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

07. In depth : Financial leakage : health and education.

Millennium  Goal 3

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

11. In depth -  education for all.

Millennium goal 3

Fourth block : the structures to be created.

Section 2:  Social structures.

4. Central committee.

Millennium Goal 3 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Millennium goal 3 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

03. Promote gender equality and empower women.

Millennium Goal 4 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Millennium Goal 4 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

04. Reduce child mortality.

Millennium Goal 5 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Millennium Goal 5 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

05. Improve maternal health.

Millennium Goal 6 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Millennium Goal 6 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

06. Combat HIV/aids, malaria and other diseases.

Millennium Goal 7 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Millennium Goal  7 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

07. Target 09 : Ensure environmental sustainability.

Millennium Goal 7 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

07. Targets 10 and 11 : Water, sanitation  and slums.

Millennium Goal 8 achievement

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Millennium Goal 8 analysis

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

08. Develop a global partnership for development.

Millennium Goals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. In depth : Financial leakages : food and water industries.

Millennium Goals

Fifth bock : How fourth block structures solve specific problems.

Section 9: Political implications.

Second part.

Millennium goals achievement

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

01. Quality of life of the inhabitants. 

Millennium goals achievement

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

02. On-going development.

Millennium goals 1 - 4

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Millennium Goals implementation plan

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

00. Summary of the Millennium Goals.

Millennium goals meeting the requirements

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

03. Summary of the results achieved.

Millennium Goals summary

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

00. Summary of the Millennium Goals.

Mini-briquettes production

Fourth block : the structures to be created.

 

Section 4: Productive structures.

2. Units for the production  of mini-briquettes.

Model competition

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

Regional plans.

Model content

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 1 : information needed.

Model form

Sixth block: The Model.

Sect. 1 : Method.

Method part 2 : the form of the Model.

Model  free of charge

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Model how to start a project

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Model index form

Sixth block: The Model.

Sect. 1 : Method.

Method part 3 : the order of sequence of the sections.

Model information needed

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 1 : information needed.

Model Information  to be adapted

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 2 : information to be adapted.

Model introduction

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Model method

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Model national plans

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

National plans.

Model protection

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Model questionnaire

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 2 : information to be adapted.

Model regional plans

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

Regional plans.

Monetary system

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Financial leakage : interest and subsidies.

Monetary system

Fourth block : the structures to be created.

Section 3: Financial structures.

2. The basic concepts – more details.

Monetisation of ecological results

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Monetisation of the economy.

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. Some factors linked with poverty.

Monetisation of the economy.

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Monetisation of the economy

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

12. Work for all.

Monetisation of the economy

Fourth block : the structures to be created.

Section 3: Financial structures.

1. The basic concepts  - introduction.

Monetisation of poverty

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

01. Eradicate extreme poverty and hunger.

Money as catalyst

Fifth block : How fourth block structures solve specific problems.

Section 3: Credit crisis.

Analysis of Model material.

Money creation

Fourth block : the structures to be created.

Section 3: Financial structures.

2. The basic concepts – more details.

Money holistic approach

Fourth block : the structures to be created.

Section 3: Financial structures.

1. The basic concepts  - introduction.

Money local recycling

Fourth block : the structures to be created.

Section 3: Financial structures.

1. The basic concepts  - introduction.

Money definition

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

01. Definition of poverty.

 

Money definition

Fourth block : the structures to be created.

Section 3: Financial structures.

1. The basic concepts  - introduction.

Money mechanics

Fourth block : the structures to be created.

Section 3: Financial structures.

2. The basic concepts – more details.

Money, role

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Money systems complementary

Fifth bock : How fourth block structures solve specific problems.

Section 9: Political implications.

Second part.

Money, value

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. Some factors linked with poverty.

Money, value

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

02. Physical safety.

Monitoring of projects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Monoculture

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Financial leakage : interest and subsidies.

Monoculture

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. Financial leakage : food and water industries.

Monoculture

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. In depth : Financial leakages : food and water industries.

Monocultures

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

07. Food security.

Monopolies

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Financial leakage : interest and subsidies.

Monopolies food supply

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

In-depth analysis.

Monopolies genetically modified foods

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

In-depth analysis.

Monopolies in local money systems

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

 

Inter-project relations at regional level.

Morais Clodomir Santos de workshops

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

2. Moraisian workshops.

Morais Clodomir Santos de workshops

Fifth block : How fourth block structures solve specific problems.

Section 2: Capacity building.

Analysis of Model material.

Morais Clodomir Santos de workshops

Fifth block : How fourth block structures solve specific problems.

Section 2: Capacity building.

In-depth analysis.

Moringa diaphragms

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

06. Typical water point.

Mortality child

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

04. Reduce child mortality.

Mortality child

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

04. Reduce child mortality.

Mortality maternal

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

05. Improve maternal health.

Mosquito nets

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

08. In depth - health and sanitation

Multinationals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Financial leakage : interest and subsidies.

Multinationals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

05. Financial leakage : energy. :

Multinationals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. In depth : debts and subsidies.

Multinationals -pharmaceuticals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

07. Financial leakage : health and education.

Multinationals- pharmaceuticals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

10. Financial leakage: development aid.

Multinationals - pharmaceuticals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

07. In depth : Financial leakage : health and education.

Multinationals -pharmaceuticals

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

06. Combat HIV/aids, malaria and other diseases.

Multinationals – subsidies.

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Debts and  subsidies.

Multiplying effects projects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

National plans

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

National plans.

National plans

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

 

Inter-project relations at national level.

National plans

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

National plans proposals

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

National plans proposals drafting of

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

Preparation of the plan.

National structures

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

07. National plans. 

Natural parks and reserves

Fifth block : How fourth block structures solve specific problems.

Section 5: Sustainability.

Analysis of Model material.

Natural resources

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. In depth : Financial leakage : theft of resources.

Natural resources commodification.

First block : Poverty and quality of life.

Part 1 : Introduction to the causes of poverty.

08. Financial leakage : theft of resources.

Natural resources commodification.

Fifth block : How fourth block structures solve specific problems.

Section 5: Sustainability.

In-depth analysis. 

Natural resources finite

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. Financial leakage : theft of resources.

Natural resources renewable

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. Financial leakage : theft of resources.

Nature conservation

Fifth block : How fourth block structures solve specific problems.

Section 5: Sustainability.

Analysis of Model material.

Nesting

Third block : Solutions to the problems.

 

Section 2 : Division of des responsibilities amongst the three levels of structures.

01. The chain of  responsibilities.

Nesting

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

1. Nesting and subsidiarity.

Nomadic groups

 

 

 

Nuclear energy – subsidies.

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. Debts and  subsidies.

Nurseries for plants

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

Analysis of Model material.

Nursing services

Fourth block : the structures to be created.

Section 5: Services structures.

10. Health structures.

Nutrition

Fourth block : the structures to be created.

Section 5: Services structures.

10. Health structures.

Off-shore accounts

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

09. Financial leakage : corruption.

On-going development

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

02. On-going development.

On-going maintenance costs

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

05. Management costs.

On-going management of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

01. The Permanent Cooperative of the Management of the Project Structures.

On-going management of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

04. Central committee level.

On-going management of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

05. The project management.

On-going management of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

02. Tank commission level.

On-going management of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

03. Well commission level.

Operational costs national level

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Order for workshops

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

4. The second phase of execution.

Order of sequence for project execution

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Organic solids

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

Analysis of Model material.

Organisation budget

Eighth block : Economic aspects.

Section 1 : Project costs.

04. Budget organisation.

Organisational workshops

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

2. Moraisian workshops.

Ownership inalienability of project structures

Eighth block : Economic aspects.

Section 1 : Project costs.

17. Protection of donors and financing parties.

Ownership of land influence on policies

Fifth block : How fourth block structures solve specific problems.

Section 9: Political implications.

Second part.

Ownership of land traditional

Fifth bock : How fourth block structures solve specific problems.

Section 9: Political implications.

Second part.

Ownership of project structures

Fifth block : How fourth block structures solve specific problems.

Section 9: Political implications.

First part. 

Ownership of project structures

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Packaging

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Packaging of foods

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. Financial leakage : food and water industries.

Packaging of foods

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. In depth : Financial leakages : food and water industries.

Paper recycling

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Participation of women

Fifth block : How fourth block structures solve specific problems.

Section 1: Gender. 

Analysis of Model material.

Participation of women

Fifth block : How fourth block structures solve specific problems.

Section 1: Gender. 

In-depth analysis.

 

Participation in benefits

Eighth block : Economic aspects.

Section 1 : Project costs.

01.  General introduction.

Partnership formation for regional plans

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Partnership global

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

08. Develop a global partnership for development.

Partnership global

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

09. Develop a global partnership for development.

Partnership global Millennium Goal 8

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 5-8.

Pastoralism

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

Analysis of Model material.

Patents and copyrights

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

06. In depth : Financial leakage : means of communication.

Patents on living organisms

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

In-depth analysis.

Percentage local contributions

Eighth block : Economic aspects.

Section 1 : Project costs.

06. Method for calculating local contributions.

Personnel for execution procurement

Eighth block : Economic aspects.

Section 1 : Project costs.

14. Tenders.

Personnel for national plans

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Personnel for projects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Personnel for regional plans

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Photovoltaic cells

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

05. Financial leakage : energy. :

Photovoltaic lighting cooling clinics

Fourth block : the structures to be created.

Section 5: Services structures.

07. Photovoltaic lighting structures.

Photovoltaic lighting for study

Fourth block : the structures to be created.

Section 5: Services structures.

07. Photovoltaic lighting structures.

Photovoltaic lighting structures

Fourth block : the structures to be created.

Section 5: Services structures.

07. Photovoltaic lighting structures.

Pharmaceuticals multinationals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

10. Financial leakage: development aid.

Pharmaceuticals multinationals

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

07. In depth : Financial leakage : health and education.

Pharmaceuticals multinationals

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

06. Combat HIV/aids, malaria and other diseases.

Photovoltaic panels

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

05. In depth - well/borehole area.

Physical safety

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

02. In depth - physical safety.

Plans national level

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

07. National plans. 

Plans national level

Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

 

Inter-project relations at national level.

Plans national level

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Plan proposal national level

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Plan proposal national level drafting

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

Preparation of the plan.

Plan proposal regional level

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Plan proposal regional level drafting

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

Preparation of the plan.

Plan regional level

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

06. Regional plans. 

Plant nurseries

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

Analysis of Model material.

Plastics recycling

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Platform hand-pumps

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

05. In depth - well/borehole area.

Platform hand-pumps

Fourth block : the structures to be created.

Section 5: Services structures.

01. Drinking water structures : organisation.

Policy consequences of integrated development projects

Fifth block : How fourth block structures solve specific problems.

Section 9: Political implications.

First part. 

Political impact of projects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Political implications of integrated development projects

Fifth block : How fourth block structures solve specific problems.

Section 9: Political implications.

First part. 

Pollution water

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

07. Targets 10 and 11 : Water, sanitation  and slums.

Poverty, definitions

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

01. Definition of poverty.

 

Poverty definitions

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

01. In depth : definition of poverty.

Poverty eradication

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

01. Eradicate extreme poverty and hunger.

Poverty eradication

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

01. Eradicate extreme poverty and hunger.

Poverty factors

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

01. Eradicate extreme poverty and hunger.

Poverty monetisation

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

01. Eradicate extreme poverty and hunger.

Poverty multidimensionality

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

01. Eradicate extreme poverty and hunger.

Preparations for project execution

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

3. The first phase of execution.

Present value of investments

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

01. Introduction.

Prevention of diseases

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

09. Complete system for waste recycling.

Prevention of diseases

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

06. Combat HIV/aids, malaria and other diseases.

Primary education

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

11. In depth -  education for all.

Primary education

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

02. Achieve universal primary education.

Primary education

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

02. Achieve universal primary education.

Primary education Millennium Goal 2

Fifth block : How fourth block structures solve specific problems.

Section 8: Millennium goals

Goals 1-4.

Primary health care package

Fourth block : the structures to be created.

Section 5: Services structures.

10. Health structures.

Primary schools

Fourth block : the structures to be created.

Section 5: Services structures.

09. Education structures.

Privacy women toilets

Fourth block : the structures to be created.

Section 5: Services structures.

04. Sanitation structures  : technique.

Problems resolution of

Eighth block : Economic aspects.

Section 2 : Management of the structures.

04. Central committee level.

Procurement plan project execution

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

7. Activity plan.

Procurement plan tenders

Eighth block : Economic aspects.

Section 1 : Project costs.

14. Tenders.

Production chain

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. Some factors linked with poverty.

Production chain

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. In depth : some factors linked with poverty.

Production chain

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

03. In depth : debts and subsidies.

Production of food

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. Financial leakage : food and water industries.

Production of food

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. In depth : Financial leakages : food and water industries.

Production of food

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

07. In depth - food security.

Production of food

Fifth block : How fourth block structures solve specific problems.

Section 4: Food crisis.

Analysis of Model material.

Production of mini-briquettes

Fourth block : the structures to be created.

 

Section 4: Productive structures.

2. Units for the production  of mini-briquettes.

Production standards

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. Financial leakage : food and water industries.

Production standards

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

04. In depth : Financial leakages : food and water industries.

Production sustainable

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

05. In depth : Financial leakage : energy.

Productive structures

Fourth block : the structures to be created.

 

Section 4: Productive structures.

1. Units for the production of articles from gypsum-based composites.

Productive structures

Fourth block : the structures to be created.

Section 4: Productive structures.

3. Bio-mass production.

Productive structures other

Fourth block : the structures to be created.

Section 4: Productive structures.

 

5. Other productive structures.

Productive structures sustainability

Fifth bock : How fourth block structures solve specific problems.

Section 5: Sustainability.

Analysis of Model material. 

Productive-unproductive activities

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

02. Some factors linked with poverty.

Productive-unproductive activities

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

12. Work for all.

Productivity increase

Fifth bock : How fourth block structures solve specific problems.

Section 3: Credit crisis.

In-depth analysis.

Project area definition

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

04. General plan of an individual project.

Project area definition

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Project  coordinator role

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

6. Chart showing the execution structures.

Project costs

Eighth block : Economic aspects.

 

Section 1 : Project costs.

01.  General introduction.

Project documentation start-up

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Project execution

Third block : Solutions to the problems.

 

Section 2 : Division of the responsibilities amongst the three levels of structures.

07. Cooperative for project execution.

Project execution activity plan

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

7. Activity plan.

Project execution auditing structures

Eighth block : Economic aspects.

Section 1 : Project costs.

16. Auditing structures.

Project execution first phase

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

3. The first phase of execution.

Project index

Sixth block: The Model.

Sect. 1 : Method.

Method part 2 : the form of the Model.

Project index

Sixth block: The Model.

Sect. 1 : Method.

Method part 3 : the order of sequence of the sections.

Procurement plan project execution

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

7. Activity plan.

Project evaluation

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

04. Efficiency and effectiveness.

Project execution quarterly activities

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

7. Activity plan.

Project execution second phase

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

4. The second phase of execution.

Project execution third phase

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

5. The third phase of execution.

Project income sustainability of

Eighth block : Economic aspects.

Section 1 : Project costs.

13. The sustainability of the system.

Project information

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 2 : information to be adapted.

Project monitoring

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Project plan general

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

04. General plan of an individual project.

Project results

Eighth block : Economic aspects.

Section 1 : Project costs.

01.  General introduction.

Project results

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Projects multiplying effects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Projects order of sequence

Seventh block :  Regional and national plans.

Section 4: Plan proposal for the integrated development of your country.

The information needed.

Projects relations amongst

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

 

Inter-project relations at national level.

Property ownership of structures

Eighth block : Economic aspects.

Section 2 : Management of the structures.

01. The Permanent Cooperative of the Management of the Project Structures.

Property rights

Second block : problems to be solved.

Section 1. Analysis of the Millennium Goals.

07. Targets 10 and 11 : Water, sanitation  and slums.

Protection of donors during project execution

Eighth block : Economic aspects.

Section 1 : Project costs.

17. Protection of donors and financing parties.

Pumps hand

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

05. In depth - well/borehole area.

Pumps hand

Fourth block : the structures to be created.

Section 5: Services structures.

02. Drinking water structures : technique. (

Pumps solar

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

05. In depth - well/borehole area.

Pumps solar

Fourth block : the structures to be created.

Section 5: Services structures.

02. Drinking water structures : technique. (

Purchasing groups cooperative

Fourth block : the structures to be created.

Section 3: Financial structures.

7. The cooperative purchasing  groups - introduction.

Purchasing groups cooperative

Fourth block : the structures to be created.

Section 3: Financial structures.

8. The cooperative purchasing groups – more details.

Purchasing groups principles

Fourth block : the structures to be created.

Section 3: Financial structures.

7. The cooperative purchasing  groups - introduction.

Quality of life

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

01. The bases of a good quality of life.

Quality of life

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

12. Work for all.

Quality of life

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

01. In depth - the bases of a good quality of life.

Quality of life of inhabitants

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

01. Quality of life of the inhabitants. 

Quality of life of inhabitants

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

03. Summary of the results achieved.

Quarterly activities execution

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

7. Activity plan.

Quarterly budgets

Eighth block : Economic aspects.

Section 1 : Project costs.

11. Quarterly budgets.

Questionnaire basic information

Fourth block : the structures to be created.

 

Section 1. Justification of the order of sequence for the creation of the structures.

3. The first phase of execution.

Questionnaire completion

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 1 : information needed.

Questionnaire information to be adapted

Sixth block: The Model.

Sect. 2 : Contents.

 

Contents part 2 : information to be adapted.

Questionnaire project documentation start-up

Sixth block: The Model.

Sect. 1 : Method.

Method part 1 : the first steps. 

Radio and telephone

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

06. Financial leakage : means of communication.

Radio and telephone

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

06. In depth : Financial leakage : means of communication.

Radio station local

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

06. In depth : Financial leakage : means of communication.

Radio station local creation

Fourth block : the structures to be created.

Section 4: Productive structures.

 

5. Other productive structures.

Radio wind-up

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

06. In depth : Financial leakage : means of communication.

Rainwater harvesting

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

04. Drinking water.

Rainwater harvesting

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

04. In depth - drinking water.

Recycling of batteries

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of concrete

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of electronics

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of glass

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of metals

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of micro-credit funds

Fourth block : the structures to be created.

Section 3: Financial structures.

6. The interest-free micro-credit systems  - more details.

Recycling of non-organic waste

Fourth block : the structures to be created.

Section 5: Services structures.

05. Waste recycling structures : organisation.

Recycling of paper

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of plastics

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of textiles

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of  waste

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

08. Health and sanitation. 

Recycling of waste

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

09. Complete system for waste recycling.

Recycling of waste

First block : Poverty and quality of life.

Section 2. Services needed for a good quality of life.

10. Dry composting toilet.

Recycling of waste

Second block : problems to be solved.

Section 2: Relate the Millennium Goals to the services for a good quality of life in Section 2 of Block 1.

01. Eradicate extreme poverty and hunger.

Recycling of waste finance

Fourth block : the structures to be created.

Section 5: Services structures.

05. Waste recycling structures : organisation.

Recycling of waste principles

Fourth block : the structures to be created.

Section 5: Services structures.

05. Waste recycling structures : organisation.

Recycling of waste technique

Fourth block : the structures to be created.

Section 5: Services structures.

06. Waste recycling structures : technique.

Recycling of waste workshops

Fourth block : the structures to be created.

Section 5: Services structures.

05. Waste recycling structures : organisation.

Regional local money relations

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

Inter-project relations at national level.

Regional local money structures

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

 

Inter-project relations at regional level.

Regional plan personnel required

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Regional plan proposal

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Regional plan proposal drafting

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

Preparation of the plan.

Regional plans

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

06. Regional plans. 

Regional plans

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

Regional plans.

Regional plans costs

Seventh block :  Regional and national plans.

Section 3: Plan proposal for the integrated development of your district or region.

The information needed.

Regional structures

Third block : Solutions to the problems.

 

Section 1 : Anthropological analysis of the three levels of structures.

06. Regional plans. 

Regional trading activities

 Seventh block :  Regional and national plans.

Section 2: Inter-project relations.

Inter-project relations at national level.

Regions trading between

 Seventh block :  Regional and national plans.

Section 1: Regional and national plans.

National plans.

Relationship formal and local money systems

Eighth block : Economic aspects.

Section 1 : Project costs.

07. Relationship between local money and formal money.

Renewable energies use

Fifth block : How fourth block structures solve specific problems.

Section 5: Sustainability.

Analysis of Model material.

Renewable resources

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. Financial leakage : theft of resources.

Resource management bio-mass

Fourth block : the structures to be created.

Section 4: Productive structures.

3. Bio-mass production.

Resources natural

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. Financial leakage : theft of resources.

Resources renewable

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. Financial leakage : theft of resources.

Resources theft

First block : Poverty and quality of life.

Section 1. Analysis of the causes of poverty.

08. In depth : Financial leakage : theft of resources.

Results projects

Eighth block : Economic aspects.

Section 1 : Project costs.

01.  General introduction.

Results projects

Eighth block : Economic aspects.

Section 3 : Costs and benefits analysis.

03. Detailed results.

Results summary

Eighth block : Economic aspects.

Section 4 : Achievement of the Millennium Goals.

03. Summary of the results achieved.

Returns on investments

Eighth block : Economic aspects.

Sect. 3 : Costs and benefits analysis.

01. Introduction.

Revenues projects sustainability

Eighth block : Economic aspects.

Section 1 : Project costs.

13. The sustainability of the system.

Risks of corruption

Fifth bock : How fourth block structures solve specific problems.

Section 6: Corruption.

Analysis of  Model material.

Role of women in development

Fourth block : the structures to be created.

Section 2:  Social structures.

1. Health clubs.

 


Main index  for the Diploma in Integrated  Development  (Dip. Int. Dev.)

Course chart.

Technical aspects.

  Student's progress chart.

 List of key words.

 List of references.


 Courses available.

Homepage Bakens Verzet


 

"Money is not the key that opens the gates of the market but the bolt that bars them."

 

Gesell, Silvio, The Natural Economic Order, revised English edition, Peter Owen, London 1958, page 228.

 


 

“Poverty is created scarcity”

 

Wahu Kaara, point 8 of the Global Call to Action Against Poverty, 58th annual NGO Conference, United Nations, New York 7th September 2005.

 


 

Creative Commons License

 

This work is licensed under a Creative Commons Attribution-Non-commercial-Share Alike 3.0 Licence..